68
Chapter 3 Maintenance
Chapter 3 Maintenance
Introduction: About Maintenance
Automatic Maintenance Function: Points to Note
This machine has a function to automatically perform periodical maintenance tasks, e.g. to prevent the print
heads from drying out. To ensure the maintenance is properly carried out, please observe the following points:
Make sure that the main power is on at all times.
Never leave the front cover open for long periods.
Maintenance Schedule
Carry out maintenance on a daily basis.
To keep this machine in tip-top condition, make sure that daily maintenance is actually performed every day.
P.71, “Daily Maintenance”
Some maintenance tasks need to be carried out periodically.
To maintain reliable output conditions, some maintenance tasks need to be carried out at least once a
month.
P.74, “Periodical Cleaning Maintenance”
Switch the sub power on at least every 2 weeks
Switch the sub power on at least every 2 weeks. When the sub power is on, operations to prevent the print
heads from drying out are automatically performed. If the machine is not used for a long period of time, print
heads may be damaged. It is important o make sure to include this task in your maintenance schedule.
Maintain the temperature and humidity within the specified range
Even when the machine is not in use, maintain the temperature between 5 to 40°C (41 to 104 °F), with a rela-
tive humidity of 20 to 80%, with no condensation. Failure to keep the temperature and humidity within the
specified range may cause a machine malfunction.
Summary of Contents for VersaStudio BR-20
Page 1: ...MASTER GUIDE ...
Page 86: ...84 ...
Page 108: ...106 ...
Page 109: ...107 ...
Page 110: ...108 ...
Page 111: ......
Page 112: ...R3 120203 ...