75
4 Adjustment
4
4-17 WIRE TENSION ADJUSTMENT
1
Remove the RAIL COVER and LEFT SIDE COVER.
Then, move the TOOL CARRIAGE to the left end of the
machine.
2
Loosen the SCREW A located at the left end of the machine.
3
Measure the TENSION at the center of the machine with
TENSION METER (ST-011).
ST-011
TENSION
METER
REAR SIDE
SCREW A
WIRE TENSION ADJUSTMENT is designed to ensure the movement of the TOOL CARRIAGE and
HEAD CARRIAGE by adding the proper tension to the WIRE.
This adjustment must be performed after replacement of the WIRE and Y PULLEY.
Summary of Contents for Color Camm Pro PC-60
Page 4: ... MEMO ...
Page 6: ...2 1 Structure Spare Parts 1 1 2 FRAME 1 ...
Page 8: ...4 1 Structure Spare Parts 1 1 3 FRAME 2 ...
Page 88: ...84 4 Adjustment 4 MEMO ...