![Rohde & Schwarz ZVB 14 Service Manual Download Page 137](http://html.mh-extra.com/html/rohde-and-schwarz/zvb-14/zvb-14_service-manual_1477898137.webp)
R&S ZVB
Instrument Construction and Function Description
1145.1078.82 3.69
E-4
Board Test
When boards are being tested, internal sources are used whenever possible. This means that it is
always assumed that the downstream board in the signal path is OK. If a clear fault is not present, the
order of the board tests given below should always be followed.
The inputs and outputs of the boards to be tested can be accessed via cables in the lower section of the
instrument (except the frequency reference board).
Opening the instrument
(See Chapter 5, drawing1145.1010)
Turn off the instrument and disconnect from the mains, screw off the 4 rear-panel feet (460) and
pull off the enclosure (400) backwards.
Remove the instrument base cover (297) after undoing the 12 countersunk screws (299).
Only when testing the frequency reference board:
Lift off the instrument top cover (296) after undoing the 23 (2 ports) or the 28 (4 ports) countersunk
screws (298).
Summary of Contents for ZVB 14
Page 4: ......
Page 10: ......
Page 56: ......
Page 58: ...Table of Contents Alignment R S ZVB 1145 1078 82 I 2 2 E 4 ...
Page 66: ......
Page 154: ...Table of Contents Software Update Installation of Options R S ZVB 1145 1078 82 I 4 2 E 4 ...
Page 158: ...5 2 ...
Page 160: ...1145 1078 82 5 2 E 4 Spare Parts List Mechanical Drawings ...
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ...1145 1078 82 5 19 E 4 Block Circuit Diagram ...
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......