Putting the System into Operation
R&S
®
ZN-Z3x
16
User Manual 1177.6381.02 ─ 03
Safety precautions
Be absolutely sure to follow the instructions in the sections below to prevent
injury to people or damage to the system components. This is particularly
important the first time that you use the instrument. In addition, be sure to
observe the general safety notes at the beginning of this manual.
2.3.1
Unpacking the ICC
The Inline Calibration Controller is delivered in a cardboard box. Proceed as fol-
lows to unpack its contents:
1. Remove the instrument from its packaging and check the shipment for com-
pleteness by comparing it with the shipping document and the accessory lists
for the various items.
2. Remove the protective covers made of corrugated cardboard from the front
and rear of the instrument.
3. Check the instrument for any damage. If there is any damage, immediately
contact the shipping company that delivered the instrument. If this case, be
absolutely certain that you keep the cardboard box and packing materials.
The delivery comprises two CAN bus control cables R&S
ZN-CAN2 (2
m length),
a power cable, a USB cable and the Software and User Documentation CD-ROM.
Packing materials
We recommend that you retain the packaging. It is advisable to keep the
original packing material in order to prevent control elements and connec-
tors from being damaged if the instrument has to be transported or shipped
at a later date.
2.3.2
Setting up the System
The Inline Calibration Controller is designed for indoor use and can be set up on
a level surface in a horizontal position.
Preparing the System