![Rohde & Schwarz DDF205 Getting Started Download Page 23](http://html1.mh-extra.com/html/rohde-and-schwarz/ddf205/ddf205_getting-started_1477685023.webp)
Operation
R&S
®
DDF205
23
Getting Started 4073.0187.02 ─ 03
Softkey fadeout
When the softkey options in the SETUP menu are not selected within 5 sec-
onds, the menu will timeout and revert to the softkeys for the panel in focus.
In this situation, the setup procedure should be repeated from the start.
2.3.2.3
Short and Long Tests
The short and long test sequences are for verifying that the signal paths are func-
tional.
1. Press the MENU key to open the "Menu" softkey bar.
2. Select the "More 1 / 2" softkey to open page 2 / 2.
3. Select the "Tests" softkey to open the "Tests" softkey menu.
4. Select the "Short Test" softkey to run the short test sequence. The short test will
take about a second to produce a result. If the test passed, the result is as shown.
5. Select the "Long Test" softkey to run the long test sequence. In the long test
sequence, all the RF paths are tested. The test will take about 30 seconds to
complete. If the tests passed, the result is as shown. Otherwise, contact qualified
Rohde & Schwarz service personnel.
2.3.2.4
Settings – Receiver and Antenna
Before proceeding with the Basic Operation section, it is useful to install a suitable
antenna or signal source into the X13 ANT V/UHF connector on the rear panel.
Graphical User Interface (GUI)