Preparing for use
R&S
®
SMM100A
15
Getting Started 1179.1335.02 ─ 04
3
Preparing for use
Here, you can find basic information about setting up the product for the first time.
3.1
Lifting and carrying
►
WARNING!
The R&S
SMM100A can be heavy, e.g., if fully equipped. Use a
"Lifting and carrying the product"
Use the carrying handles at the side for lifting and carrying the
R&S
SMM100A.
The handles at the front are only for pushing and pulling the instrument when
mounting in a rack, see
Chapter 3.4.2, "Mounting the R&S
3.2
Unpacking and checking
1. Unpack the R&S
SMM100A carefully.
2. Retain the original packing material. Use it to protect the control elements and
connectors when transporting or shipping the R&S
SMM100A later.
See also chapter "Transporting" in the user manual.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact
Rohde
&
Schwarz.
Unpacking and checking
Summary of Contents for 1440.8002.02
Page 1: ...R S SMM100A Vector Signal Generator Getting Started 1179133502 Version 04 Ý S2 ...
Page 6: ...Contents R S SMM100A 6 Getting Started 1179 1335 02 04 ...
Page 14: ...Key features R S SMM100A 14 Getting Started 1179 1335 02 04 ...
Page 28: ...Preparing for use R S SMM100A 28 Getting Started 1179 1335 02 04 Switching on or off ...
Page 44: ...Instrument tour R S SMM100A 44 Getting Started 1179 1335 02 04 Rear panel tour ...
Page 90: ...Instrument control R S SMM100A 90 Getting Started 1179 1335 02 04 Remote operation over VNC ...
Page 92: ...Contacting customer support R S SMM100A 92 Getting Started 1179 1335 02 04 ...