
Getting Started With Manual Test
CTS60
1094.0006.60
4.4
E-3
Synchronisation Menu
Step 4
Return to the Synchronisation
menu and wait for the CTS60 to
Synchronise with the fixed part.
Press "Connect" on the Synchro-
nisation menu to set up the
connection.
Connection Established Menu
The display will change to the
Connection Established Menu.
This is the central measurement
menu. It displays an overview of
the power ramp and modulation
measurements. Detailed trans-
mitter and receiver measurement
results can be displayed by se-
lecting and starting the appro-
priate measurement.
Connection Established Menu
Step 5
The connection can be released
at any point by pressing the
"Bearer Release" or "Menu up"
keys on the Connection Estab-
lished menu. The CTS60 will then
return to the Synchronisation
menu.