![Roberts Gorden Vantage CTH2V-100 Installation, Operation & Service Manual Download Page 28](http://html.mh-extra.com/html/roberts-gorden/vantage-cth2v-100/vantage-cth2v-100_installation-operation-and-service-manual_1469690028.webp)
CTH2V-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
22
Step 6.3.2 Couplin
g
and Tube Assembly (Continued)
Step 6.4 Turbulator Installation
10' ± 1'
(305 cm ± 25 cm)
Total Overall
Tube Length
7' 6" ± 1'
(229 cm ± 25 cm)
Model
Tube Len
g
th Minimum
CTH2V-40
10' (3 m)
CTH2V-60
20' (6 m)
CTH2V-80
20' (6 m)
CTH2V-100
30' (9 m)
CTH2V-125
40' 12 m)
CTH2V-150
50' (15 m)
CTH2V-175
60' (18 m)
Description
Part Number
T
u
rb
u
lator Adapter
03051501
T
u
rb
u
lator Section
03051502
T
u
rb
u
lator Section (stainless)
03051505
T
u
be
91409XXX
Turbulator Installation
Model
Tube Section
CTH2V-40
1st 10' Section
CTH2V-60
2nd 10' Section
CTH2V-80
2nd 10' Section
CTH2V-100
3rd 10' Section
CTH2V-125
N/A
CTH2V-150
N/A
CTH2V-175
N/A
Install t
u
rb
u
lator as specified in
the "T
u
rb
u
lator Installation"
charge belo
w
. T
u
rb
u
lator is not
req
u
ired on the CTH2V-125,
150, 175.
Summary of Contents for Vantage CTH2V-100
Page 2: ......
Page 4: ......
Page 6: ......
Page 58: ...CTH2V SERIES INSTALLATION OPERATION AND SERVICE MANUAL 52 ...
Page 59: ...SECTION12 TROUBLESHOOTING 53 12 2 Manifold Gas Pressure Setting ...
Page 64: ......
Page 65: ...2017 ...
Page 66: ......
Page 67: ......
Page 68: ......