![Roberts Gorden Vantage CTH2V-100 Installation, Operation & Service Manual Download Page 20](http://html.mh-extra.com/html/roberts-gorden/vantage-cth2v-100/vantage-cth2v-100_installation-operation-and-service-manual_1469690020.webp)
CTH2V-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
14
Table 4: Component Packa
g
e Guide
Table 5: Component Packa
g
e Guide
Altho
u
gh not recommended, additional t
u
be lengths may be added to the heater. T
u
bing m
u
st be hot-rolled
steel, al
u
minized (heat-treated) or porcelain coated. Additional t
u
be lengths beyond the specified minim
u
m
t
u
bing length are considered
v
ent pipe for length determination. Maxim
u
m
v
ent length allo
w
ed is 45' (13.7 m)
total.
Model
Tubin
g
Len
g
th
Standard Core Packa
g
es
Minimum
Hot Rolled Steel
Aluminized
CTH2V-40
10’ (3m)
-
CP10ALUM
CTH2V-60
20’ (6m)
CP20HRS
CP20ALUM
CTH2V-80
20’ (6m)
CP20HRS
CP20ALUM
CTH2V-100
30’ (9m)
CP30HRS
CP30ALUM
CTH2V-125
40’ (12m)
CP40HRS
CP40ALUM
CTH2V-150
50’ (15m)
C EXP20HRS
CP EXP20ALUM
CTH2V-175
60’ (18m)
C EXP30HRS
CP EXP30ALUM
Model
Tubin
g
Len
g
th
Hi
g
h Efficiency Core Packa
g
es
Minimum
Hot Rolled Steel
Aluminized
CTH2V-40
10’ (3m)
-
CP10ALUMEF
CTH2V-60
20’ (6m)
CP20HRSEF
CP20ALUMEF
CTH2V-80
20’ (6m)
CP20HRSEF
CP20ALUMEF
CTH2V-100
30’ (9m)
CP30HRSEF
CP30ALUMEF
CTH2V-125
40’ (12m)
CP40HRSEF
CP40ALUMEF
CTH2V-150
50’ (15m)
CP3 EXP20HRSEF
CP30 EXP20ALUMEF
CTH2V-175
60’ (18m)
CP3 EXP30HRSEF
CP30 EXP30ALUMEF
Summary of Contents for Vantage CTH2V-100
Page 2: ......
Page 4: ......
Page 6: ......
Page 58: ...CTH2V SERIES INSTALLATION OPERATION AND SERVICE MANUAL 52 ...
Page 59: ...SECTION12 TROUBLESHOOTING 53 12 2 Manifold Gas Pressure Setting ...
Page 64: ......
Page 65: ...2017 ...
Page 66: ......
Page 67: ......
Page 68: ......