Rinnai
22
ES_FIM
COMPONENT ASSEMBLY & CONNECTION WALL TERMINAL ~ ESDFK & ESWTERM
CAUTION
Flue
MUST
terminate in accordance with AS/NZS 5601 Figure 6.2. Especially relevant is the
requirement to have a minimum of 300mm clearance between the flue terminal and the finished
ground level. It is
NOT
permissible to excavate a hole to obtain the required 300mm clearance,
unless there is sufficient drainage provision.
ONLY
ESDFK and or ESPIPE900 can be modified to create a wall terminal.
ONLY
use non-acidic silicone sealant between the joints of PVC flue pipe and any mating
aluminium components (such as those of ESWTERM) to secure and seal these joints against
ingress of dust and water.
Silicone containing acetic acid, (characteristically having a vinegar odour), as the curing agent or
other acids may cause corrosion of aluminium components and
MUST NOT
be used.
1.
Fit the supplied external wall plate over the outer pipe of the flue protrusion.
As an installation aid the wall plate has a 2°offset. As such the orientation of the wall plate will set the
flue system with either a 2° fall or rise as required. Set the flue system with a 2° fall away from the heater by
aligning the arrow symbol so that it is upper most.
!
Once the external wall plate is in the correct position secure it to the wall using the three 22mm screws
into the holes provided.
!
The wall plate is then secured to the outer pipe of the flue protrusion using the
two horizontal holes and the two 7mm screws provided.
2.
Carefully cut through the outer and inner pipes of the flue protrusion as close to the external wall plate as
possible.
!
Take care to avoid cutting the external wall plate and keep the cuts of both internal and external
pipes as parallel as possible. All burrs and swarf are to removed from all cut ends.
3.
Align the arrows of the metal mushroom flue terminal and the wall plate to point in the same direction
and screw the terminal to the external wall plate using the 22mm screws into the holes provided.
COMPONENT ASSEMBLY & CONNECTION ~ ESBEND
CAUTION
ONLY
use PVC cement between externally located joints of PVC pipes to secure and seal
these joints against ingress of dust and water.
ONLY
use non-acidic silicone sealant between
externally located joints of PVC flue pipe and any mating aluminium components (such as the
condensate trap) to secure and seal these joints against ingress of dust and water.
Silicone containing acetic acid, (characteristically having a vinegar odour), as the curing agent or
other acids may cause corrosion of aluminium components and
MUST NOT
be used.
On “Direct”, “Direct Extended” and “External Wall” installations
ONLY 2 X ESBEND (2 X 90°)
can be used. On “Sideways”, “Under Floor” and “In-Wall” installations
ONLY 1 X ESBEND (1
X 90°)
can be used.
1.
Lubricate an
ESBEND
inner pipe ‘O-Ring’ and fit to the inner pipe of the nominated component. Use
ONLY
the supplied silicone based “O Ring” seal lubricant.
DO NOT
use petroleum based lubricants such
1
3
2
22mm x 3
7mm x 2
22mm x 3
2
3
4
5
6
1
Centering Spacer
Centering Spacer
Centering Spacer
Centering Spacer
INSTALLATION METHODS
Summary of Contents for ENERGYSAVER RHFE-308FTR
Page 31: ...Rinnai 31 ES_FIM NOTES ...