SIDEWAYS FLUE INSTALLATION METHOD
C
F
G
D
A
B
B
E
Y
Total flue length can be up
to nine (9) metres long and
can contain a maximum of
two (2) ESBEND (2x90°)!
Activities for creating a Sideways flue installation:
A
Modify ESDFK for Sideways Installation.
B
Create Penetration in Side Panel. *
C
Locate Heater.
D
Connect Heater Exhaust.
CAUTION
E
Connect Combustion Air Hose.
CAUTION
F
Installation & fastening of Back Cover Kit (ESBSK)
G
Cut, Fit & Secure Components.
(seal joints as required)
CAUTION
Y
Refer to steps
F
&
G
of Direct & Direct Extended.
(as required)
Z
Finalise Installation & Commissioning of Heater.
* Create penetration only in side panel associated
with the direction of the horizontal flue run.
The Sideways flue installation can run along the left or right hand side of the internal wall behind the heater.
CAUTION
Most components in a sideways flue installation are located indoors and may be in an
accessible position after installation. To prevent accidental or erroneous dislodgement, the joints
between ESDFK and ESPIPE900 components
MUST
be secured by pop rivet or screw through
the outer Co-Axial pipes and flue pipes are to be clipped to the wall using the stand off clips
supplied or other suitable method.
Steps for creating a Sideways flue installation are as follows:
1.
Using a drill, remove the pop rivet used to fasten the straight flue pipe connection pipe to the flue transition of
ESDFK and remove but
DO NOT
discard the straight flue pipe connection.
2. Fit the elbowed flue pipe connection supplied with the Back Cover kit to the flue transition pushing it fully
home and then fasten in place with the grub screw (supplied) using an Allen key. The grub screw terminates in
a groove in the flue transition. When fastened this prevents accidental dislodgement of the pipe connections.
3.
Refit the straight flue pipe connection to the end of the elbow until it is fully home and then fasten in place
with a 3mm rivet.
CAUTION
Ensure the straight pipe and elbow are securely fastened to the flue transition by the grub
screw and rivets.
Test soundness of the connections by attempting to 'pull apart' the assembled components.
Improper assembly or fastening can result in products of combustion dispersing into the room
being heated which may result in a dangerous condition.
4. Temporarily position the heater in the desired position.
1
2
3
GRUB
SCREW
(Supplied)
3mm RIVET