background image

7

GENERAL INFORMATION

GENERAL INFORMATION

EMPTYING IN 10’

RBS 2S Ready-i

200

300

430

550

PERFORMANCE RELATING TO INTEGRATION COIL
Quantity of domestic water obtained in 10’ with heater pre-heated to 60°C (*) and primary exchanger at the indicated deliv-

ery temperature, considering an increase of the domestic water temperature of 30°C between inlet and outlet (according to 

EN 12897).

Upper coil delivery temperature
80°C

166

260

330

345

l

70°C

138

255

323

340

l

60°C

131

250

308

336

l

PERFORMANCE RELATING TO SOLAR COIL
Quantity of domestic water obtained in 10’ with heater pre-heated to the indicated temperature (**) considering an increase 

of the domestic water temperature of 30°C between inlet and outlet (according to EN 12897).

Temperature of accumulation tank lower part
70°C

374

438

659

863

l

60°C

284

375

531

675

l

50°C

205

310

390

485

l

DESCRIPTION

SOLAR STATION TECHNICAL DATA

Safety valve calibration pressure

6

bar

Maximum operating temperature

110

°C

Power supply

230~50

V-Hz

Min/max electrical current draw

0,08 ÷ 0,58

A

Min/Max power consumption

5 ÷ 63

W

Pressure drops

TOP COIL

PRESSURE DROP (mbar)

400

300

200

500

100

0

0

1000

2000

3000

4000

300

200

430

550

FLOW RATE (l/h)

Useful head available

BOTTOM COIL

USEFUL HEAD AVAILABLE (mbar)

700

675

650

0

400

200

300

500

100

700
650

550

450

500

600

400
350
300

0

400 600 800 1000

200

1200 1400

550

300

430

200

200

300

430

550

FLOW RATE (l/h)

Values referred to a mix of water and 30% glycol.

The circulator speed is controlled through PWM signal and varies 

according to the thermal gradient between solar collectors and 

storage.

Pay attention to the system overall load losses (exchanger, solar 

collectors and pipes) at the maximum foreseen flow rate con-

ditions.

Summary of Contents for RBS 200 2S Ready-i

Page 1: ...cod 20122045 rev 1 03 2017 RBS 2S Ready i EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Page 2: ...ISH CONTENTS The following symbols are used in this manual 9 9CAUTION Identifies actions that require caution and adequate preparation 0 0STOP Identifies actions that you MUST NOT do This manual Code...

Page 3: ...the product purchase documents to be presented to the R authorised Technical Assistance Service to request a service call under warranty 9 9Size the solar expansion tank so as to ensure complete ab s...

Page 4: ...te This lists the technical specifications and performance of the product Model bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 kW m2 T067765IES SOLARBOILER Serial numb Code Year...

Page 5: ...6 bar 14 Tap A for system filling draining 15 Tap B for system filling draining 16 Delivery Valve solar plant delivery with built in non return valve 17 Outlet temperature gauge 18 Return Valve solar...

Page 6: ...3 1 51 W K Energy class B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 40...

Page 7: ...tank lower part 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Page 8: ...than IP X0D 0 3 m 0 6 m 0 3 m 0 6 m 0 7 m NOTE the above indicated dimensions are recommended for a correct maintenance and access to the device 9 9When installing the boiler allow sufficient space ar...

Page 9: ...1 33 450 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1338 1838 1644 1988 mm B 1170 1670 1440 1784 mm C 1098 1438 1289 1653 mm D 953 1233 1064 1428 mm F 598 693 684 7...

Page 10: ...revailing standards of the installation country respect the polarity of the L1 Phase N Neutral con nections use cables with insulation and cross section conforming to applicable standards minimum cros...

Page 11: ...to terminal board M1 of solar regulator terminals L N GND making refer ence to the instructions provided in the specific regulator manual Once electrical connections are completed fasten cables using...

Page 12: ...r collectors For further information please refer to the glycol safety data sheet When using glycol not pre mixed Do NOT part fill the circuit with pure glycol then add water later Ensure that filling...

Page 13: ...ressure To set the system pressure correctly refer to the design manual 0 0Do not fill the system in bright sunny conditions or if the collectors are hot 9 9Use a manual bleed valve which should be in...

Page 14: ...20 3 Safety valve removal 9 9Remove when system has cooled down Before removing the safety valve Cut power off to the solar station and to the connected integration system by setting the system s mai...

Page 15: ...with the product 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Page 16: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Reviews: