background image

10

INSTALLATION

INSTALLATION

14 

TYPICAL WATER SYSTEM SCHEMATICS

The diagram below shows the solar regulator default setting.

IMP 1

 1

Please refer to the instruction manual supplied with the solar 

regulator for any system setup and further details.

15 

WIRING DIAGRAMS

CN4

CN3

M4

M3

M2

M1

3

2

1

4 5 6

CN6

F

AE

230V ~ 50Hz

AN

GD

U1

U2

N L

(B)

(A)

(S6)

S4

(S5)

S3

S2

S1

S1 S2 S3

C

S4

AE

 

Power supply (connections to be made by the 

installer)

S1

 

Collector 1 temperature probe (connections to be 

made by the installer)

S2

 

Storage system lower temperature probe

S3

 

Storage system upper temperature probe

S4

 

Option probe (not supplied)

M1-M4

 

Terminal strip

C

 Pump

CN6

 

PWM connector

F

 

Cable guide

16 

ELECTRICAL CONNECTIONS

 

9

The following is mandatory:

 

− have an omnipolar magneto-thermal circuit breaker and 

a disconnecting switch compliant with the prevailing 

standards of the installation country

 

− respect the polarity of the L1 (Phase) - N (Neutral) con-

nections

 

− use cables with insulation and cross section conforming 

to applicable standards (minimum cross section 1.5 mm

2

)

 

− refer to the wiring diagrams in this manual for all electric 

operations

 

− make  sure  the  appliance  is  connected  to  an  efficient 

ground (earth).

 

0

It is strictly forbidden to use pipes of any kind to ground the 

appliance.

Please refer to solar regulator manual for further details on elec-

trical connections.

The manufacturer is not responsible for any damage caused by 

failure to earth connect the device and failure to comply with 

what is indicated in the wiring diagrams.

Refer to the manual supplied with the solar controller for de-

tails of all electrical connections, programming, etc..

The solar regulator is provided already wired except for the pow-

er supply cable and the temperature probe of the solar collector.

To make electrical connections, undo screw (1) on cover and re-

move cover from solar regulator.

1

P

Summary of Contents for RBS 200 2S Ready-i

Page 1: ...cod 20122045 rev 1 03 2017 RBS 2S Ready i EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Page 2: ...ISH CONTENTS The following symbols are used in this manual 9 9CAUTION Identifies actions that require caution and adequate preparation 0 0STOP Identifies actions that you MUST NOT do This manual Code...

Page 3: ...the product purchase documents to be presented to the R authorised Technical Assistance Service to request a service call under warranty 9 9Size the solar expansion tank so as to ensure complete ab s...

Page 4: ...te This lists the technical specifications and performance of the product Model bar W l W kW l 1 BOLLITORE SOLARE Modello Matricola Codice Anno m2 m2 kW m2 T067765IES SOLARBOILER Serial numb Code Year...

Page 5: ...6 bar 14 Tap A for system filling draining 15 Tap B for system filling draining 16 Delivery Valve solar plant delivery with built in non return valve 17 Outlet temperature gauge 18 Return Valve solar...

Page 6: ...3 1 51 W K Energy class B B B B PERFORMANCE RELATING TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 40...

Page 7: ...tank lower part 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110...

Page 8: ...than IP X0D 0 3 m 0 6 m 0 3 m 0 6 m 0 7 m NOTE the above indicated dimensions are recommended for a correct maintenance and access to the device 9 9When installing the boiler allow sufficient space ar...

Page 9: ...1 33 450 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1338 1838 1644 1988 mm B 1170 1670 1440 1784 mm C 1098 1438 1289 1653 mm D 953 1233 1064 1428 mm F 598 693 684 7...

Page 10: ...revailing standards of the installation country respect the polarity of the L1 Phase N Neutral con nections use cables with insulation and cross section conforming to applicable standards minimum cros...

Page 11: ...to terminal board M1 of solar regulator terminals L N GND making refer ence to the instructions provided in the specific regulator manual Once electrical connections are completed fasten cables using...

Page 12: ...r collectors For further information please refer to the glycol safety data sheet When using glycol not pre mixed Do NOT part fill the circuit with pure glycol then add water later Ensure that filling...

Page 13: ...ressure To set the system pressure correctly refer to the design manual 0 0Do not fill the system in bright sunny conditions or if the collectors are hot 9 9Use a manual bleed valve which should be in...

Page 14: ...20 3 Safety valve removal 9 9Remove when system has cooled down Before removing the safety valve Cut power off to the solar station and to the connected integration system by setting the system s mai...

Page 15: ...with the product 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with exter nal temperatures above 0 C set the heat...

Page 16: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Reviews: