Detailed Descriptions
131
D124
The type of maintenance operation is selected and executed automatically based on
the time elapsed from the start of downtime.
Maintenance Cycles Based on Idle Time
No.
Downtime
Try to Detect
Air?
If air is detected for a print
head
*
1
If no air detected
1
< 10 h
No
---
---
2
> 10 and < 24 h
Yes
Ink supply, air purge/ink fill
sequence
Small downtime ink purge
3
> 24 h and < 3 days
Yes
Ink supply, air purge/ink fill
sequence
Large downtime ink purge
4
> 3 days, < 7 days
Yes
Ink supply, air purge/ink fill
sequence
Large downtime ink purge 3
times
5
> 7 days and < 45
days
Yes
Ink supply, air purge/ink fill
sequence > Downtime
cleaning
Downtime cleaning
6
> 45 days
Yes
Ink supply, air purge/ink fill
sequence > Downtime
cleaning
Ink fill sequence > Downtime
cleaning
*
1
The cycle is executed for the affected print head unit only.
The maintenance cycle could be brief or require several minutes to complete
depending on ambient conditions and how long the print heads have remained idle.
Approximate Times Required for Cleaning
No.
Downtime
Approximate Time
1
< 10 h
16 sec.
2
> 10 and < 24 h
9 sec.
*
1
3
> 24 h and < 3 days
3 min.
4
> 3 days, < 7 days
3 min. or more
5
> 7 days and < 45 days
30 min.
6
> 45 days
More than 30 min.
*
1
9 sec. at power on, at job start possibly up to 16 sec.
The following SP codes can be used to modify automatic cleaning after downtime:
SP2513
Maintenance After Leftover Threshold.
SP2514
Auto Cleaning Start Threshold.
SP2521-001
to
-003
Maintenance After Leftover Repeat.
SP2517
Maintenance After Leftover Information.
SP2520
Maintenance After Leftover Setting On/Off Switch.
For more details, please refer to the SP tables in the Appendices.
Summary of Contents for D124
Page 1: ...D124 DETAILED DESCRIPTIONS MANUAL ...
Page 2: ......
Page 20: ...D124 14 Detailed Descriptions 1 2 GENERAL LAYOUT ...
Page 24: ...D124 18 Detailed Descriptions 1 4 MOTORS CLUTCHES AIR RELEASE SOLENOID ...
Page 28: ...D124 22 Detailed Descriptions 1 6 ORIGINAL PATH PAPER PATH SENSORS ...
Page 62: ...D124 56 Detailed Descriptions 3 1 2 SCAN JOB IMAGE DATA FLOW 3 1 3 PRINT JOB IMAGE DATA FLOW ...