1-24
Container Stacker Installation Instructions
8.
Connect the AF cable of 4 pin white connector coming from the Container
Stacker 2 to the J680 on the ST09X P/K of the Container Stacker 1. (Connection 1
on the following illustration)
9.
Take out the CST AC cable of 2 pin white connector from the Container Stacker 1
and connect it to the CST AC cable of 2 pin white connector of the Container
Stacker 2. (Connection 2 on the following illustration)
10.
Take out the RB cable from the Container Stacker 1 and connect it to the RB
cable of Container Stacker 2. (Connection 3 on the following illustration)
11.
Mount the CST FG cable coming from Container Stacker 1 on the frame of
Container Stacker 2 using M4 Screw (Connection 4 on the following illustration).
NOTE
:
Put the cable through opening “A” of the Printer.
On SW1 mounted on the CPXXX P/K, set switch No. 4 and No. 5 to ON
and set No. 2 and No. 8 to OFF. (Front Engine of 184 ppm)
Connection 2
(2 pin white)
Connection 1
(20 pin black)
AF cable
RB cable
(For Container Stacker 2)
RB cable
(For Container Stacker 1)
Connection 3
(4 pin white)
CST AC cable
CST FG cable
M4 screw
Connection 4
Printer
Container Stacker
2
(W/ Sample tray)
(W/ Through path)
Opening “A”
Container Stacker 1
Disconnection 1
(4 pin white)
Disconnection 2
(2 pin white)
70/92 ppm
184 ppm: Connect the CS Relay Cable (see Page 19 Step 21.
Summary of Contents for Container Stacker
Page 5: ...ii Table of Contents ...