
5)
Lift the bottom half of the bag bringing it up to
the roller. Notice that the bottom half is one
continuous section of plastic that runs the entire
length of the roller and that it is the black inner layer
of plastic that is visible.
Punch the plastic sheet through each holding stud
(Fig. 17) leaving a remainder of 10 or 20 inches to the
edge.
Do not worry if the plastic is not perfectly distributed
along the length of the roller or if folds and creases
remain after attachment
(Fig. 18)
.
Fig.17
Fig.18
911
Summary of Contents for EA 910
Page 1: ...CDDF00051A RICHIGER EA 910 UNLOADER Parts list Operator s Manual ...
Page 3: ......
Page 10: ...02 Dimensions in millimeters Work position Transport position 9 03 5200 2500 6705 ...
Page 30: ...14 Lubrication chart 9 23 18 15 16 18 19 19 ...
Page 31: ...Lubrication chart 24 17 20 21 22 17 23 ...
Page 41: ...Notes 34 ...
Page 43: ...Sheet N 1 PTO driveline wheels EA 910 36 ...
Page 45: ...EA 350 EA 910 Sheet N 2 Frame 38 EA 910 ...
Page 47: ...30 26 27 28 29 26 27 31 EA 910 Sheet Nº 3 Front end driveline main drive shaft 40 ...
Page 57: ...30 31 Sheet Nº 8 Discharge auger upper section EA 910 50 ...
Page 61: ...Sheet Nº 10 Rear end driveline EA 910 54 ...
Page 63: ...Sheet Nº 11 Gear case EA 910 56 ...
Page 68: ...61 ...
Page 70: ...Sheet Nº 13 Sweep augers EA 910 62 ...
Page 71: ...Sheet Nº 14 Hydraulic controls EA 910 64 16 15 ...
Page 73: ...Sheet Nº 15 Hydraulic circuit EA 910 66 ...
Page 75: ...Notes 68 ...
Page 76: ......