
OPERATION
SE8A 01/11
Operation Section 4-32
© 2011 Alamo Group Inc.
OPERA
T
ION
9.5 Crossing Ditches and Steep Inclines
When crossing ditches with steep banks or going up
sharp inclines, it is possible that the main driveline
inner profile will penetrate into the outer housing to its
maximum depth until the assembly becomes solid
(driveline is at its extreme shortest length). This type
of abusive operation can cause serious damage to
the tractor and mower drive by pushing the PTO into
the tractor and through the support bearings or
downward onto the PTO shaft, breaking it off.
Damage resulting from over-collapse of the driveline’s inner profile and its outer housing
may allow the driveline to come loose from the Tractor which could cause bodily injury to the
operator or bystanders and/or extensive damage to the Tractor or Implement.
OPS-R-0020
When confronted with an incline or ditch, do not
approach from an angle which is perpendicular or
straight on as damage to or over-collapse of the
driveline may occur.
OPS-R-0021_A
Summary of Contents for SE8A
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Page 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Page 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Page 189: ......