
ASSEMBLY
SE8A 01/11
Assembly Section 3-10
© 2011 Alamo Group Inc.
ASSEMBL
Y
JACKSHAFT BEARING SUPPORT ASSEMBLY (PULL TYPE)
Attach the Jackshaft bearing support bracket (1) to the tongue. Loosely attach bearing support by using pivot
bolt (3) with bushing (6), flatwasher (7), and locknut (8) on each side. Install Bearing and housing assembly (4).
Install spacers (5), bolt (2), and locknut (9) leaving installed loosely. Tighten bolt (2) NOTE: Do not tighten to
point of collapsing spacer (5). Tighten pivot bolt (3)
NOTE: Do not over tighten. Make sure Carrier Bearing (4) pivots in supports and complete assembly pivots on
lower bolts. Slide Jackshaft through bearing (4) on Jackshaft.
CHECK TO BE SURE GEARBOX IS FILLED WITH LUBRICANT UP TO THE TEST PLUG LEVEL.
The lubricant required is Multi-purpose gear oil (P/N 00786250) for extreme pressure and temperature.
The Center Gearbox capacity is 2-1/2 quarts and the Outer Gearbox capacity is 1-3/4 quarts.
Summary of Contents for SE8A
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Page 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Page 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Page 189: ......