7.1 Driveline Length Check
When fitting the mower to the tractor, the telescoping driveline must be inspected to ensure that at its most
compressed position, the profiles do not “bottom out”, and when at its farthest extended position, there is
sufficient engagement between the profiles to operate safely. At its shortest length, there must be at least a 1”
clearance between each profile end and opposite profile universal joint. At its farthest operating extension, a
minimum profile engagement of 12” must be maintained.
When attaching the Implement input driveline to the Tractor PTO, it is important that the
connecting yoke spring activated locking collar slides freely and the locking balls are seated
securely in the groove on the Tractor PTO shaft. Push and pull the driveline back and forth
several times to ensure it is securely attached. A driveline not attached correctly to the
Tractor PTO shaft could come loose and result in personal injury and damage to the
Implement.
(S3PT-17)
Before operating the Implement, check to make sure the Implement input driveline will not
bottom out or become disengaged. Bottoming out occurs when the inner shaft penetrates
the outer housing until the assembly becomes solid-it can shorten no more. Bottoming out
can cause serious damage to the Tractor PTO by pushing the PTO into the Tractor and
through the support bearings or downward onto the PTO shaft, breaking it off. A broken
driveline can cause personal injury.
(S3PT-18)
“Bottoming Out” Check Procedure
•
Disconnect driveline from the tractor and slide
the profiles together until fully compressed.
•
Place a mark on the inner shield 1/8” from the
end of the outer shield.
•
Reattach the driveline to the PTO Shaft.
•
Lift and Semi-Mount Type
- Raise the mower/
Pull Type
- Turn sharply and watch the
driveline as it approaches the mark. If the
distance between the mark and the end of the
outer shield tube becomes less than 2” at any
point, the driveline must be shortened.
OPS-
R-0004_D
Summary of Contents for SE8A
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Page 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Page 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Page 189: ......