
ASSEMBLY
SE8A 01/11
Assembly Section 3-3
© 2011 Alamo Group Inc.
ASSEMBL
Y
A-FRAME ASSEMBLY - LIFT TYPE
1. Align each A-Frame Short Bar (5) with small hole in lug on Main Frame. Install 3/4" x 2" bolt (2) through
Main Frame Lug and A-Frame Short Bar. Secure with locknut (14).
2. Install bushing (8) through large holes in Top Link Bar (7). Align bushing in Top Link Bar between both A-
Frame Short Bars (5) and both Front Strap Bars (9). Secure with 3/4" x 6" bolt (11) and locknut (14).
3. Align bushing (4) between small holes in Top Link Bar (7). Install pin (3) through Top Link Bar, and fasten
with clip pin (6).
4. Attach Rear Support Bars (13) between Front Strap Bars (9), in inside hole, with 3/4" x 2-1/2" bolt (12) and
locknut (14). Install bushing (10) between outside holes of Front Strap Bars (9), and fasten with 3/4" x 2-1/
2" bolt (12) and locknut (14).
5. Attach Rear Support Bars (13) to the rear lugs on the Main Frame with 3/4" x 2" bolts (2) and locknuts (14).
ITEM
QTY
DESCRIPTION
1.
2
Hitch Pin
2.
8
Bolt
3.
1
Top Link Pin
4.
1
Top Link Bushing
5.
2
A-Frame Bushing
6.
1
Clip Pin
7.
1
Top Link Bar
8.
1
A-Frame Bushing
9.
2
Front Strap Bar
10.
1
A-Frame Bushing
11.
1
Bolt
12.
2
Bolt
13.
2
Rear Support Bar
14.
7
Locknut
Summary of Contents for SE8A
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Page 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Page 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Page 189: ......