
ASSEMBLY
SE8A 01/11
Assembly Section 3-9
© 2011 Alamo Group Inc.
ASSEMBL
Y
CHECK CHAINS (ACCESSORY EQUIPMENT) FOR LIFT-MODELS
Check Chains are available for attachment to front of Mower as necessary. Check chains are used to control
cutting height and especially to allow Mower to be lowered to the same preset cutting height effortlessly.
Install lower end of check chain (4) on hitch ear pin (6). Use lynch pin (7) to secure chain.
Install chain lugs (3) on either side of tractor top link mounting (5) using bolt or pin (2) of required diameter and
length. Cat I kit requires a 3/4 inch diameter bolt. Cat II kit requires a 1 inch diameter bolt.
Cutting height is then set by placing proper chain link in keyhole slot. Cutting height is easily adjustable by
hooking chain higher or lower in the keyholes in chain lug (3).
For additional safety in transport, raise mower as high as possible without having driveline
hit deck and shorten check chains as much as possible to prevent inadvertent falling in
transport.
Summary of Contents for SE8A
Page 6: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 30: ...SAFETY SE8A 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 31: ...SAFETY SE8A 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY SE8A 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY SE8A 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY SE8A 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY SE8A 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY SE8A 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 37: ...SAFETY SE8A 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 38: ...SAFETY SE8A 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 40: ......
Page 41: ......
Page 67: ......
Page 93: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 98: ......
Page 99: ...Assembly Section 3 1 ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 160: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 4 2011 Alamo Group Inc MAINTENANCE...
Page 161: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 5 2011 Alamo Group Inc MAINTENANCE...
Page 174: ...MAINTENANCE SE8A 01 11 Maintenance Section 5 18 2011 Alamo Group Inc MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 SECCI N DE SEGURIDAD...
Page 189: ......