ASSEMBLY
FN10/FN15 NITRO 02/10
Assembly Section 3-6
© 2010 Alamo Group Inc.
ASSEMBL
Y
Many of the equipment components are
HEAVY
(60 lbs. or greater) and Special Lifting
Procedures are recommended. Use lifting assistance such as mechanical assistance, two
people, and proper lifting techniques when connecting or installing the driveshaft to reduce
the possibility of back injuries.
1. Remove double clamp bolts from main driveline implement connection yoke and insert onto power divider
gearbox shaft. Insert clamp bolt and tighten to 170 ft. lbs.
When attaching the Implement input driveline to the Tractor PTO, it is important that the
connecting yoke spring activated locking collar slides freely and the locking balls are seated
securely in the groove on the Tractor PTO shaft. Push and pull the driveline back and forth
several times to ensure it is securely attached. A driveline not attached correctly to the
Tractor PTO shaft could come loose and result in personal injury and damage to the
Implement.
(S3PT-17)
DRIVELINE ATTACHMENT
The driveline yoke and tractor PTO shaft must be
dirt free and greased for attachment.
To connect the mower driveline to the tractor PTO
output shaft, pull the driveline yoke collar back and
align the grooves and splines of the yoke with those
of the PTO shaft. Push the driveline yoke onto the
PTO shaft, release the locking collar, and position
the yoke until the locking collar balls are seated
onto the PTO shaft. Push and pull the driveline
back and forth several times to ensure a secure
attachment.
OPS-R-0003_I
Summary of Contents for Flex 15 Nitro
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Page 93: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Page 143: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Page 145: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 3 2010 Alamo Group Inc MAINTENANCE...
Page 161: ......
Page 162: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 20 2010 Alamo Group Inc MAINTENANCE...
Page 163: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 21 2010 Alamo Group Inc MAINTENANCE...