OPERATION
FN10/FN15 NITRO 02/10
Operation Section 4-44
© 2010 Alamo Group Inc.
OPERA
T
ION
Tire Size and Matching requirements - Center Axle
Tire assemblies when mounted on center axle duals should always be within limits listed.
Laminated Tires - Maximum difference between tire diameters on a center axle should be 1/2 inch or less.
Foam Filled Airplane Tires - Maximum difference between tire diameters on a center axle should be 1 inch or
less.
When replacing a tire assembly on center axle always check diameters to make sure tires fall within allowed
range for maximum tire and wheel life. It may be necessary to move one or more tires from wing axles to
remain within size limit.
14.1 Tire and Wheels
Laminated Sectional Tires
are designed for conditions where puncture proof performance is required and
the mower will not be transported for long distances on roadways. Transport speed for laminated tires should
not exceed 15 MPH. Excessive speed can cause damage to the machine and tire sections. Laminated tires
must be installed such that the rubber segments lay with the ground.
Foam Filled used Airplane Tires
are ideal for conditions where a puncture proof tire is needed and the
mower is frequently transported between locations.
Pneumatic Tires
Implement tires are ideal for frequent long distance towing, however, they are not puncture
proof and are not recommended for mowing brushy areas or other conditions that could damage the tires.
Check side wall of tire for proper inflation pressure. DO NOT over-inflate.
OPS-R-0035
Summary of Contents for Flex 15 Nitro
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Page 93: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Page 143: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Page 145: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 3 2010 Alamo Group Inc MAINTENANCE...
Page 161: ......
Page 162: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 20 2010 Alamo Group Inc MAINTENANCE...
Page 163: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 21 2010 Alamo Group Inc MAINTENANCE...