OPERATION
FN10/FN15 NITRO 02/10
Operation Section 4-24
© 2010 Alamo Group Inc.
OPERA
T
ION
Operating the mower with loose blade hardware will damage the blade holder or blades and
can result in blade breakage or blade fastener failure. Broken blades or bolts can be thrown
out from under the mower for distances up to 300 feet. When the blades are replaced, the
fastening hardware must be replaced. Check and retighten the blade hardware after the first
eight hours of operation. In severe cutting conditions, recheck the blade carrier and blade
bolt torque every 50 hours.
To help prevent structural damage caused by loose hardware, tighten gearbox mounting
hardware as specified. Check the fastener torque after first 8 hours of use and every 50
hours thereafter.
Inspect the Blades daily for abnormal wear. REPLACE BOTH BLADES on that carrier
IMMEDIATELY if either blade has:
•
Become bent or deformed from it’s original shape or
•
Any cracks are visible, or
•
Deep gouges in the blade’s surface are present, or
•
Gouges or chipped areas in the cutting edge are larger than 1/2”(12.7mm), or
•
The material on the leading edge has been worn away by more than 1/2(12.7mm)”
Failure to replace abnormally worn blades may lead to catastrophic failure of the blades and ejection of the
broken part with tremendous force which may cause serious bodily injury or death.
OPS-U-0032
Summary of Contents for Flex 15 Nitro
Page 7: ...Safety Section 1 1 2010 Alamo Group Inc SAFETY SECTION...
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2010 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2010 Alamo Group Inc ASSEMBLY SECTION...
Page 93: ...Operation Section 4 1 2010 Alamo Group Inc OPERATION SECTION...
Page 143: ...Maintenance Section 5 1 2010 Alamo Group Inc MAINTENANCE SECTION...
Page 145: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 3 2010 Alamo Group Inc MAINTENANCE...
Page 161: ......
Page 162: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 20 2010 Alamo Group Inc MAINTENANCE...
Page 163: ...MAINTENANCE FN10 FN15 NITRO 01 11 Maintenance Section 5 21 2010 Alamo Group Inc MAINTENANCE...