Assembly Instructions
22x24x12 Peak Style Two Car Garage
terrain should be planned so that it does not run into the
unit. As well, rain or melting snow that comes off the
unit should be drained away rather than accumulate and
pool around the unit.
Check to be certain that adequate clearance is allowed
for entry and exit from ends of unit. As unit has doors on
both ends, ideally vehicle or contents can be inserted or
removed from either end.
V2.3
3
FRAME ASSEMBLY
Step1.
Assemble the Front and Rear End Arch
Assemblies (2) using (1) Top Crest Tube (TC-2000), (2)
Top Straight Supports (TS-6000), (2) Bent Tube Side
Crest (BTSC-2006) and (2) End Upright w/Foot (EUL-
2002) for each End Arch Assembly. Slide the male
(swedged) end of the frame components into the
matching female end of the next frame member. Use 2
¼” Carriage Bolts (CBN-3005-2) with washer and nuts to
assemble the arch assemblies through the pre-drilled
holes.
Be certain to insert carriage bolts from the outer edge
into the interior of the unit, with the washers and nuts on
the inside of the arches. This will avoid tearing the fabric
on doors and main cover when installed. Do not tighten
the nuts completely until the frame is completed and set
in place.
Step 2
. Assemble (2) Corner Wind Braces (CW-2005) to
the End Upright w/Foot (EUL-2002) on each of the End
Arch assemblies. Use a 2 1/8” (CBN-3005-2) Carriage
Bolt with Washer and Nut to secure the braces loosely to
the Upright. Do not tighten completely.
Step 3
. Assemble the remaining four Interior Arch
Assemblies using (1) Top Crest Tube (TC-2000), (2)
Bent Tube Side Crest (BTSC-2006), (2) Top Straight
Supports (TS-6000), and (2) Center Straight Upright
(CSU-2001) for each Interior Arch Assembly. Use 3¼ ”
(CBN-3005-3) carriage bolts with washers and nuts in
the pre-drilled holes, aligned to form the arch.
Step 4
. Prepare the first End Arch Assembly by
supporting it temporarily in the vertical position. Connect
the (4) Plain End Cross Rails 1” diameter (ECR-2003) to
the End Arch at the base rail and side rails positions.
Use (4) 3¼” (CBN-3005-3) carriage bolts, washers, and
nuts through the pre-drilled holes in the arch members.
The Cross Rails should be put into the bottom and side
hole of the arch upright. Again, don’t tighten the
hardware until the next arch and cross rails are
assembled. It is very important to make certain all nuts
are on the inside of the unit to avoid damaging the cover
when put on.
Stand an interior arch assembly up approximately 48”
apart from the End Arch Assembly. Position it so the
cross rails from the End Arch Assembly align with the
holes in the Interior Arch. Using (4) 3¼” Carriage Bolts
(CBN-3005-3) with nuts and washers, connect the cross
rails between the end arch and the first interior arch
assemblies. Connect the (2) Wind Braces #CW-2005
diagonally across the end and interior arch as shown in
the frame illustration. Use flat 9/16” washer on the
carriage bolt for the wind braces.
Step 5
. Begin the Top Ridge Rail by placing the
remaining Plain End Cross Rails (ECR-2003)
underneath the End Top Crest Tube. Secure the Cross
Rail loosely with a 3¼” Carriage Bolt (CBN-3005-3) with
washer and nut facing the interior of the unit. Place the
other end of the cross rail over the first Interior Arch as
shown in the picture below.
EUL-2002
End Upright w/Foot
TC-2000 Top
Crest Tube
BTSC-2006
Bent Tube Side
Crest
CW-2005 Corner
Wind Brace
End Cross Rails
Under End Arch
Cross Rails Over
Interior Arches
Side Cross Rail
TSS-6000 Top Straight Supports