background image

Assembly Instructions

 

22x24x12 Peak Style Two Car Garage  

terrain should be planned so that it does not run into the 
unit.  As well, rain or melting snow that comes off the 
unit should be drained away rather than accumulate and 
pool around the unit. 

Check to be certain that adequate clearance is allowed 
for entry and exit from ends of unit.  As unit has doors on 
both ends, ideally vehicle or contents can be inserted or 
removed from either end. 

V2.3

3

FRAME ASSEMBLY 

Step1.

  Assemble the Front and Rear End Arch 

Assemblies (2) using (1) Top Crest Tube (TC-2000), (2) 
Top Straight Supports (TS-6000), (2) Bent Tube Side 
Crest (BTSC-2006) and (2) End Upright w/Foot (EUL-
2002) for each End Arch Assembly.  Slide the male 
(swedged) end of the frame components into the 
matching female end of the next frame member.  Use 2 
¼” Carriage Bolts (CBN-3005-2) with washer and nuts to 
assemble the arch assemblies through the pre-drilled 
holes.   

Be certain to insert carriage bolts from the outer edge 
into the interior of the unit, with the washers and nuts on 
the inside of the arches.  This will avoid tearing the fabric 
on doors and main cover when installed.  Do not tighten 
the nuts completely until the frame is completed and set 
in place. 

Step 2

. Assemble (2) Corner Wind Braces (CW-2005) to 

the End Upright w/Foot (EUL-2002) on each of the End 
Arch assemblies.  Use a 2 1/8” (CBN-3005-2) Carriage 
Bolt with Washer and Nut to secure the braces loosely to 
the Upright.  Do not tighten completely. 

Step 3

. Assemble the remaining four Interior Arch 

Assemblies using (1) Top Crest Tube (TC-2000), (2) 
Bent Tube Side Crest (BTSC-2006), (2) Top Straight 
Supports (TS-6000), and (2) Center Straight Upright 
(CSU-2001) for each Interior Arch Assembly.  Use 3¼ ” 
(CBN-3005-3) carriage bolts with washers and nuts in 
the pre-drilled holes, aligned to form the arch. 

Step 4

.  Prepare the first End Arch Assembly by 

supporting it temporarily in the vertical position.  Connect 
the (4) Plain End Cross Rails 1” diameter (ECR-2003) to 
the End Arch at the base rail and side rails positions.  
Use (4) 3¼” (CBN-3005-3) carriage bolts, washers, and 
nuts through the pre-drilled holes in the arch members.  
The Cross Rails should be put into the bottom and side 
hole of the arch upright.  Again, don’t tighten the 
hardware until the next arch and cross rails are 
assembled.  It is very important to make certain all nuts 
are on the inside of the unit to avoid damaging the cover 
when put on. 

Stand an interior arch assembly up approximately 48” 
apart from the End Arch Assembly.  Position it so the 
cross rails from the End Arch Assembly align with the 
holes in the Interior Arch.  Using (4) 3¼” Carriage Bolts 
(CBN-3005-3) with nuts and washers, connect the cross 
rails between the end arch and the first interior arch 
assemblies.  Connect the (2) Wind Braces #CW-2005 
diagonally across the end and interior arch as shown in 
the frame illustration.  Use flat 9/16” washer on the 
carriage bolt for the wind braces. 

Step 5

.  Begin the Top Ridge Rail by placing the 

remaining Plain End Cross Rails (ECR-2003) 
underneath the End Top Crest Tube.  Secure the Cross 
Rail loosely with a 3¼” Carriage Bolt (CBN-3005-3) with 
washer and nut facing the interior of the unit.  Place the 
other end of the cross rail over the first Interior Arch as 
shown in the picture below. 

EUL-2002 
 End Upright w/Foot 

TC-2000 Top 
Crest Tube 

BTSC-2006 

Bent Tube Side 

Crest 

CW-2005 Corner 
Wind Brace 

End Cross Rails 
Under End Arch

Cross Rails Over 
Interior Arches 

Side Cross Rail 

TSS-6000 Top Straight Supports 

Summary of Contents for Two Car Peak

Page 1: ...signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will mo...

Page 2: ...t End Arches See Step 5 for details End Arch Assembly Top Ridge Rail Side Cross Rails Top Straight Support Bent Tube Side Crest End Upright with Foot Corner Wind Brace Center Straight Uprights Base Cr...

Page 3: ...ght Upright CSU 2001 for each Interior Arch Assembly Use 3 CBN 3005 3 carriage bolts with washers and nuts in the pre drilled holes aligned to form the arch Step 4 Prepare the first End Arch Assembly...

Page 4: ...d be done with at least one person lifting each frame upright to avoid bending or stressing any frame members Under End Arch Frame should now be squared up in position Use a straight line string to al...

Page 5: ...e frame to be secured to almost any surface In addition you have also been provided with a 36 Drive Rod used to drive the anchor heads into the earth If the location where you are placing the building...

Page 6: ...nside of the frame arch End Door Panels have pre cut slits that allow frame members to pass through so rope pocket is inside unit Place the top rail ridge pole and the side cross rails through the mat...

Page 7: ...ood door fit Tie off the end off the rope to a second turnbuckle attached to a hole in the foot of the end arch on the opposite side The end panel can be adjusted further by tightening the turnbuckles...

Page 8: ...round in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amo...

Page 9: ...ual detergent Allowing dirt and debris to sit on cover over an extended time will damage cover irreparably Severe Weather in preparation for inclement weather completely secure the doors on both ends...

Reviews: