Assembly Instructions

 

22x24x12 Peak Style Two Car Garage  

This step is key to good fit and to prevent door 
movement in wind. 

The rope channels should be located inside the unit, with 
the frame members passing through the pre-cut slots in 
the end panel/door.  Replace and tighten the carriage 
bolts after putting the end panel into position. 

V2.3

7

Step 3.

  Tie off one end of the rope coming out of the 

end panel to a turnbuckle. Turnbuckle should be 
loosened all the way and the open hook end attached to 
the hole in the inside of the end arch foot.  Hold the end 
of the unsecured rope and apply pressure downward 
with a foot to remove excess.  Re-adjust gathered 
material evenly along door rope.  This step is key to 
getting a good door fit.  Tie off the end off the rope to a 
second turnbuckle attached to a hole in the foot of the 
end arch on the opposite side.  The end panel can be 
adjusted further by tightening the turnbuckles. 

Note: Adjust/Snug the end panel by turning the 

turnbuckles or repeating step 3 on a regular basis 

MAIN COVER INSTALLATION 

Step 1

.  To elongate the life of Main Cover, put a small 

square of duct tape (field supplied) over each bolt head 
on frame that comes in contact with cover.  The tape 
acts as a cushion to avoid rubbing damage to the cover 
over years.  As an alternative, foam rubber pipe 
insulation also makes a good cushioning material over 
frame parts. 

Unpack the Main Cover #MUC-7000 from the protective 
plastic packaging.  The line of grommets on the inside 
(white) of the cover on the tie down Flap run parallel to 
the sides of the frame assembly for positioning.  Once 
cover is oriented parallel to the side of the Frame 

Summary of Contents for Two Car Peak

Page 1: ...signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will mo...

Page 2: ...t End Arches See Step 5 for details End Arch Assembly Top Ridge Rail Side Cross Rails Top Straight Support Bent Tube Side Crest End Upright with Foot Corner Wind Brace Center Straight Uprights Base Cr...

Page 3: ...ght Upright CSU 2001 for each Interior Arch Assembly Use 3 CBN 3005 3 carriage bolts with washers and nuts in the pre drilled holes aligned to form the arch Step 4 Prepare the first End Arch Assembly...

Page 4: ...d be done with at least one person lifting each frame upright to avoid bending or stressing any frame members Under End Arch Frame should now be squared up in position Use a straight line string to al...

Page 5: ...e frame to be secured to almost any surface In addition you have also been provided with a 36 Drive Rod used to drive the anchor heads into the earth If the location where you are placing the building...

Page 6: ...nside of the frame arch End Door Panels have pre cut slits that allow frame members to pass through so rope pocket is inside unit Place the top rail ridge pole and the side cross rails through the mat...

Page 7: ...ood door fit Tie off the end off the rope to a second turnbuckle attached to a hole in the foot of the end arch on the opposite side The end panel can be adjusted further by tightening the turnbuckles...

Page 8: ...round in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amo...

Page 9: ...ual detergent Allowing dirt and debris to sit on cover over an extended time will damage cover irreparably Severe Weather in preparation for inclement weather completely secure the doors on both ends...

Reviews: