Assembly Instructions
22x24x12 Peak Style Two Car Garage
25
SCR-2004
Swedged End Cross Rails
5
ECR-2003
Plain End Cross Rails
8 TB-3004
Turnbuckles
35
CBN-3005-4
Carriage Bolts – 4”
42 CBN-3005-
278
Carriage Bolts – 2-7/8”
77 CBN-3005-N 9/16”
Nuts
69
CBN-3005-W Washers – 9/16” Cupped
8
Washers – 9/16” Flat
2 R-3003
3/16”
Rope
14 DBA-3000 Earth
Cable
Anchors
14
UB-3002
U Bolts with Nuts
1
DR-3001
36” Anchor Drive Rod
4
EP-1000
2-3/8” Plastic End Plugs
10
EP-1001
1” Plastic End Plugs
Note: All Side & Base Cross Rails MUST be on the
inside of Arch frame members. Top Ridge Cross
Rails MUST be on the outside of Arch frame
members, except at End Arches. See Step 5 for
details.
End Arch Assembly
Top Ridge Rail
Side Cross Rails
Top Straight Support
Bent Tube Side
Crest
End Upright with
Foot
Corner Wind Brace
Center Straight Uprights
Base Cross
Rails
Top Crest Tube
SITE PREPARATION
Select a level or as close to level as practical location for
your Rhino Shelter unit. The unit should be placed on a
base of materials suitable for the storage load to be
protected. The unit should not be located under trees,
which will shed hard fruit such as apples, walnuts, or
heavy pinecones. The cover of your unit will protect
against normally leaves and light debris, however large
branches or other falling items may cause puncture or
tears in the cover material.
Take notice of drainage both near and around your
intended location. Water draining from the surrounding
V2.3
2