background image

Assembly Instructions

 

22x24x12 Peak Style Two Car Garage  

25 

SCR-2004 

Swedged End Cross Rails 

ECR-2003 

Plain End Cross Rails  

8 TB-3004 

Turnbuckles 

35 

CBN-3005-4 

Carriage Bolts – 4” 

42 CBN-3005-

278 

Carriage Bolts – 2-7/8” 

77 CBN-3005-N 9/16” 

Nuts 

69 

CBN-3005-W  Washers – 9/16” Cupped 

Washers – 9/16” Flat 

2 R-3003

3/16” 

Rope 

14 DBA-3000  Earth 

Cable 

Anchors 

14 

UB-3002 

U Bolts with Nuts 

DR-3001 

36” Anchor Drive Rod 

EP-1000 

2-3/8” Plastic End Plugs

10 

EP-1001 

1” Plastic End Plugs 

Note: All Side & Base Cross Rails MUST be on the 

inside of Arch frame members.  Top Ridge Cross 

Rails MUST be on the outside of Arch frame 

members, except at End Arches. See Step 5 for 

details. 

End Arch Assembly

Top Ridge Rail

Side Cross Rails 

Top Straight Support 

Bent Tube Side 
Crest 

End Upright with 
Foot 

Corner Wind Brace 

Center Straight Uprights 

Base Cross

 

Rails

Top Crest Tube 

SITE PREPARATION 

Select a level or as close to level as practical location for 
your Rhino Shelter unit.  The unit should be placed on a 
base of materials suitable for the storage load to be 
protected.  The unit should not be located under trees, 
which will shed hard fruit such as apples, walnuts, or 

heavy pinecones.  The cover of your unit will protect 
against normally leaves and light debris, however large 
branches or other falling items may cause puncture or 
tears in the cover material. 

Take notice of drainage both near and around your 
intended location.  Water draining from the surrounding 

V2.3

2

Summary of Contents for Two Car Peak

Page 1: ...signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will mo...

Page 2: ...t End Arches See Step 5 for details End Arch Assembly Top Ridge Rail Side Cross Rails Top Straight Support Bent Tube Side Crest End Upright with Foot Corner Wind Brace Center Straight Uprights Base Cr...

Page 3: ...ght Upright CSU 2001 for each Interior Arch Assembly Use 3 CBN 3005 3 carriage bolts with washers and nuts in the pre drilled holes aligned to form the arch Step 4 Prepare the first End Arch Assembly...

Page 4: ...d be done with at least one person lifting each frame upright to avoid bending or stressing any frame members Under End Arch Frame should now be squared up in position Use a straight line string to al...

Page 5: ...e frame to be secured to almost any surface In addition you have also been provided with a 36 Drive Rod used to drive the anchor heads into the earth If the location where you are placing the building...

Page 6: ...nside of the frame arch End Door Panels have pre cut slits that allow frame members to pass through so rope pocket is inside unit Place the top rail ridge pole and the side cross rails through the mat...

Page 7: ...ood door fit Tie off the end off the rope to a second turnbuckle attached to a hole in the foot of the end arch on the opposite side The end panel can be adjusted further by tightening the turnbuckles...

Page 8: ...round in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amo...

Page 9: ...ual detergent Allowing dirt and debris to sit on cover over an extended time will damage cover irreparably Severe Weather in preparation for inclement weather completely secure the doors on both ends...

Reviews: