GAS INFLATION SYSTEM
July 13/11
9101
6 - 5
Warning:
The charged gas cylinder can become a lethal projectile if discharged to
atmosphere when not fitted with a diffuser cap. Always fit diffuser caps to a
cylinder valve outlet when handling a fully charged cylinder.
1.
Inspect hoses and non-return valves for visual defects and security.
2.
Weigh the cylinder and check it against the weight marked on the cylinder. Refer to Table B in
Chapter 8 – Assembly for information on weight tolerance.
Note:
The charged weight does not include the weight of the bleeding down tool or a
diffuser cap, and due allowance for these items must be made when checking
the full weight.
3.
Check that the syphon tube (IPL Fig. 2, Item 30) inside the cylinder is still serviceable. Shake the
cylinder, if the tube is still flexible it will strike the wall of the cylinder with a ringing sound. If
there is a noticeable delay before the sound is heard, the tube has stiffened and is no longer
serviceable. The cylinder must be rejected.
Note:
Refer to Chapter 8 – Assembly for recharging instructions. If a cylinder is to be
recharged, it is imperative that the correct quantities of CO
2
/N
2
gas are
achieved.
4.
Check the date of the last hydrostatic pressure test. (Refer to Chapter 4, Testing)
Note:
Hydrostatic testing is required by the DOT within the past 5 years before a
cylinder can be recharged.
Note:
A cylinder valve inflation test will need to be performed at every other
inspection (6 years).
Note:
Perform a hydrostatic test and overhaul the cylinder valve after every cylinder
valve inflation test.
5.
The external condition of the cylinder must be checked. (See Chapter 8 – Assembly for details)
Summary of Contents for 45-AE4V
Page 2: ......
Page 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ......
Page 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ......
Page 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Page 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Page 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Page 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Page 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Page 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Page 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Page 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Page 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Page 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Page 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Page 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Page 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Page 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Page 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Page 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Page 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Page 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Page 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Page 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Page 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Page 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Page 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Page 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Page 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Page 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Page 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Page 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Page 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Page 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Page 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Page 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Page 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Page 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Page 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Page 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Page 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Page 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Page 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Page 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Page 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 182: ...Feb 20 13 11 14 9101...
Page 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Page 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Page 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Page 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Page 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Page 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 234: ......