GENERAL
This section contains instructions for minimum performance testing of the Coastal and Offshore Elite
Liferafts. The performance test provides a functional equipment check to establish the ability of the
systems and components to perform required design function or before the reinstallation of rafts
removed from service.
Maintenance inspections for the Elite rafts occur every three (3) years or sooner if necessary depending
on the prevailing conditions.
Additional inspections are required for the following:
A.
An Elite raft has been removed from its carrying case, functionally tested, or
inflated/deployed for demonstration purposes. Perform the inspection before the raft is
returned to service regardless of the date of the last maintenance inspection.
B.
An Elite raft has been subjected to severe handling of adverse conditions to ensure no
damage has occurred to the raft.
See Chapter 10 Tools, Equipment, and Materials for detailed descriptions of any tools used in the
following testing procedures. These tools are necessary for testing the liferaft. When not in use, the
test equipment and special tools are to be kept in good condition and safe from damage.
It will be necessary to remove the packed liferaft from the vessel in order to perform testing
procedures. Refer to Chapter 3 – Disassembly of this manual for information regarding unpacking of
the liferaft. Ensure the working area is clean and dry, free from sharp projections, and large enough to
fit the liferaft. The work surface should be smooth, preferably constructed of linoleum or PVC
covering.
Warning: Use extreme caution when handling any part of the inflation system. The
inflation system is charged and armed. Inadvertent activation of the inflation
system may cause personal injury or damage raft components.
Caution: Extreme care must be exercised when handling a liferaft to protect it from
punctures or tears. Do not step or walk on any part of the liferaft. Do not drop
or throw the liferaft whether packed or unpacked.
Caution: Unless necessary, do not perform a functional test on an inflation system
component while the inflation system is still attached to the liferaft. Repeated
deployment, especially when the raft is not in the water, may cause premature
deterioration of the raft fabric in the vicinity of the CO
2
port. Inflate the raft
using compressed air through the topping-off inflation valves.
Note:
When possible, use a closed-end box wrench instead of an open end wrench to
assure optimum tool grip and to minimize damage to valve and body surfaces.
July 13/11
9101
4 - 3
Summary of Contents for 45-AE4V
Page 2: ......
Page 4: ...June 2 08 RR 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 6: ......
Page 8: ...June 2 08 SB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ......
Page 19: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9101 AP 1 AP None Listed...
Page 20: ...June 2 08 AP 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...June 2 08 AB 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...June 2 08 TC 2 9101 THIS PAGE IN INTENTIONALLY LEFT BLANK...
Page 26: ...June 2 08 1 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 30: ...June 2 08 2 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 32: ...FIGURE 1 COASTAL AND AERO ELITE Oct 21 16 2 4 9101...
Page 33: ...FIGURE 2 OFFSHORE ELITE June 2 08 9101 2 5...
Page 34: ...June 2 08 2 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 39: ...FIGURE 3 VALISE AND CONTAINER June 2 08 9101 2 11...
Page 40: ...FIGURE 4 INFLATION SYSTEM June 2 08 2 12 9101...
Page 44: ...July 13 11 2 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 46: ...FIGURE 5 DEPLOYMENT July 13 11 2 18 9101...
Page 47: ...DISASSEMBLY June 2 08 9101 3 1 3 General 3 Procedures 5...
Page 48: ...June 2 08 3 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 50: ...June 2 08 3 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 54: ...FIGURE 2 REMOVAL FROM CONTAINER VALISE June 2 08 3 8 9101...
Page 55: ...FIGURE 3 DISCONNECTING THE PAINTERLINE June 2 08 9101 3 9...
Page 56: ...FIGURE 4 REMOVAL FROM VACUUM BAG July 13 11 3 10 9101...
Page 57: ...FIGURE 5 UNFOLD RAFT DISENGAGE THE CYLINDER June 2 08 9101 3 11...
Page 58: ...June 2 08 3 12 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9101...
Page 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9101...
Page 66: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9101...
Page 73: ...FIGURE 1 LEFT CHAMBER INFLATION COASTAL July 13 11 9101 4 15...
Page 74: ...FIGURE 3 UPPER CHAMBER INFLATION OFFSHORE June 2 08 4 16 9101...
Page 75: ...FIGURE 5 DIGITAL MANOMETER Feb 20 13 9101 4 17...
Page 76: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 18 9101...
Page 82: ...June 2 08 5 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 84: ...June 2 08 5 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 86: ...June 2 08 5 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 88: ...June 2 08 6 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 90: ...June 2 08 6 4 9101 THIS PAGE INITIALLY LEFT BLANK...
Page 92: ...June 2 08 6 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 94: ...June 2 08 6 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 96: ...June 2 08 6 10 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...June 2 08 7 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...June 2 08 7 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9101 7 13...
Page 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM July 13 11 7 14 9101...
Page 112: ...June 2 08 7 16 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 114: ...June 2 08 8 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 116: ...June 2 08 8 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 119: ...FIGURE 2A SEA ANCHOR PREPARATION June 2 08 9101 8 7 FIGURE 2B STOWING PAINTERLINE...
Page 120: ...FIGURE 3 CONTAINER SPECIFICATIONS June 2 08 8 8 9101...
Page 122: ...FIGURE 4B 120in TIE LINE CONNECTION July 13 11 8 10 9101...
Page 140: ...FIGURE 5 TOPPING OFF INFLATE DEFLATE VALVE July 13 11 8 28 9101...
Page 141: ...FIGURE 7 STOWAGE OF COMPONENTS June 2 08 9101 8 29...
Page 143: ...FIGURE 8B FOLDING DIAGRAM STEP 2 July 13 11 9101 8 31...
Page 144: ...FIGURE 8C FOLDING DIAGRAM STEP 3 July 13 11 8 32 9101...
Page 146: ...FIGURE 8E FOLDING DIAGRAM STEP 5 Feb 20 13 8 34 9101...
Page 147: ...FIGURE 8F FOLDING DIAGRAM STEP 6 July 13 11 9101 8 35...
Page 148: ...FIGURE 8G FOLDING DIAGRAM STEPS 7 8 July 13 11 8 36 9101...
Page 149: ...FIGURE 9 BURST STRAP ATTACHMENT July 13 11 9101 8 37...
Page 150: ...FIGURE 10 GASKET REMOVAL July 13 11 8 38 9101...
Page 151: ...FIGURE 12 ATTACHMENT OF MOORING PAINTERLINES July 13 11 9101 8 39...
Page 152: ...FIGURE 14 SEALING BAG July 13 11 8 40 9101...
Page 153: ...FIGURE 15A PLACING BAG IN VALISE July 13 11 9101 8 41...
Page 154: ...FIGURE 16 INFLATION VAVE PAINTERLINE CONNECTION June 2 08 8 42 9101...
Page 155: ...FIGURE 18 CONTAINER STRAPS Feb 20 13 9101 8 43 FIGURE 19 HEAT SHRINK SLEEVES...
Page 156: ...FIGURE 20 TAPE FOR STRAPS AND PAINTERLINE Feb 20 13 8 44 9101...
Page 157: ...STORAGE June 2 08 9101 9 1 9 General 3...
Page 158: ...June 2 08 9 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 160: ...June 2 08 9 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 161: ...TOOL EQUIPMENT AND MATERIALS Feb 20 13 9101 10 1 10 General 3 Tool List 5...
Page 162: ...June 2 08 10 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 164: ...June 2 08 10 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...Feb 20 13 10 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 170: ...June 2 08 11 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 174: ...June 2 08 11 6 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 176: ...June 2 08 11 8 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 182: ...Feb 20 13 11 14 9101...
Page 186: ...FIGURE 2 CYLINDER VALVE ASSEMBLY June 2 08 11 18 9101...
Page 188: ...FIGURE 3 INFLATION VALVE ASSEMBLY June 2 08 11 20 9101...
Page 190: ...FIGURE 4 CONTAINER ASSEMBLY July 13 11 11 22 9101...
Page 204: ...Feb 20 13 11 36 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 205: ...SPARE PARTS LIST Feb 20 13 9101 12 1 12 Introduction 3 Image List 5 Tool Image List 21...
Page 206: ...Feb 20 13 12 2 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 208: ...Feb 20 13 12 4 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 229: ...Feb 20 13 9101 12 25 Description Part Number O Ring Install Kit 95 EOIK34...
Page 230: ...Feb 20 13 12 26 9101 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 232: ...July 13 11 9101 A 2 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 234: ......