Revision 2.6
Page 14 of 53
Intuitive Mercury 6-5M Controller with TDB
www.resourcedm.com
Warning
Please Note
The specifications of the product detailed on this
Set-Up Guide may change without notice. RDM
Ltd. shall not be liable for errors or for incidental
or consequential damages, directly and indirectly,
in connection with the furnishing, performance or
misuse of this product or document.
Ensure that all power is
switched off before
installing or maintaining
this product
Program Settings
Right click on the work space and select “Settings…” The following options will be shown.
Building an Application Example
Using the tools provided in the toolbox, drag and drop the objects that form your application onto the workspace. Connect up the objects inputs
and outputs. Using the properties box, set the appropriate values. Run a simulation to prove the design; see simulation.
Once the design is complete, save your application; see saving design.
Frost Alarm
The above diagram shows a simple Data Builder application for a frost alarm. An outside temperature probe is connected to an analogue input
and this is compared to a frost set-point. If the temperature goes below this set point (using a less than block) the output of the less than block
goes on. This goes to the alarm block that has a delay of 10 minutes. If the signal is still on after the 10 minutes, the relay will be energised.
Host
Set depending on the controller hardware configuration
Program
Description
Enter a suitable description for the TDB program created.
Program Options
Temp. Units
Select between Degrees Celsius or Fahrenheit operation from the
drop down list.
Refresh
Timeout
Period after which the Refresh Timeout Output on Network
Analogue Input and Network Digital Input will come on when
comms between the TDB controller and the Data Manager are lost