![Reliance electric 57C430B Instruction Manual Download Page 54](http://html1.mh-extra.com/html/reliance-electric/57c430b/57c430b_instruction-manual_1436334054.webp)
EĆ5
L0
Therunbaseneeds to beloaded onto therack
b0
Rack configuration is being validated
d0
Application task installation in progress
d1
Waiting on synchronizing event (in a rack with
multipleprocessors)
d2
Waiting on mutual exclusion lock (in a rack with
multipleprocessors)
Corrective action for b0 and d0 that do not change or disappear: reĆload
configuration fileand application tasks.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com