V E C T O R
O W N E R ’ S
M A N U A L
Page
• 43
SETTING UP THE PULL-OUT DEPLOYMENT SYSTEM
When a Vector 3 is to be set up with the pull-out main deployment system, the bridle/pin and handle setup must first
be attached to the pilot chute. To do this, perform the following:
1
. First, thread the end of the bridle with no hook and loop fastener on it through the loop located on the handle/pin
setup.
Cocking the pilot
chute allows the pilot
chute to inflate when
thrown into the air-
stream. An uncocked
pilot chute will remain
collapsed and subse-
quently create a pilot
chute in tow situation.
2
. Always remember to cock your pilot
chute before you begin packing and always
recheck it after you place the bag into the
container. This assures that the bridle has
not become partially uncocked while
packing. You must see the green marking
on the kill line to be sure it is cocked.
2
. Next, thread the end of the bridle
through the crossed tape and centerline at
the base of the pilot chute.
section 4 : setting up pull out system
Summary of Contents for V3 M-Series
Page 1: ......
Page 2: ...V E C T O R O W N E R S M A N U A L Page 2 ...
Page 14: ...Page 14 V E C T O R O W N E R S M A N U A L NOTES section 1 ...
Page 34: ...Page 34 V E C T O R O W N E R S M A N U A L NOTES section 3 ...
Page 58: ...Page 58 V E C T O R O W N E R S M A N U A L NOTES section 4 ...
Page 70: ...Page 70 V E C T O R O W N E R S M A N U A L NOTES section 6 ...
Page 83: ......
Page 84: ......