Page
• 35
V E C T O R
O W N E R ’ S
M A N U A L
SECTION
ASSEMBLING AND PACKING THE MAIN PARACHUTE
!
Introduction
36
!
Attaching the Main Canopy to the Main Risers
36
!
Using Soft Links
36
!
Using Rapide Links
37
!
Attaching the Main Steering Toggles
37
!
Procedures
37
Method A - Dacron Lines
37
Method B - Spectra Lines
40
!
Attaching the Collapsible Pilot Chute
41
!
Operation of the Collapsible Pilot Chute
42
!
Setting up the Pull-Out Deployment System
43
!
Main Canopy Packing Instructions
44
!
About the Deployment Brakes
44
!
Procedures for Setting Deployment Brakes
45
Tru-Lok Deployment Brake System
45
Standard Deployment Brake System
47
!
Packing the Main Container
48
!
Closing the Main Container
50
!
Folding Pilot Chute for BOC
53
!
Packing Pull Out Deployment System
56
44444
section 4
Summary of Contents for V3 M-Series
Page 1: ......
Page 2: ...V E C T O R O W N E R S M A N U A L Page 2 ...
Page 14: ...Page 14 V E C T O R O W N E R S M A N U A L NOTES section 1 ...
Page 34: ...Page 34 V E C T O R O W N E R S M A N U A L NOTES section 3 ...
Page 58: ...Page 58 V E C T O R O W N E R S M A N U A L NOTES section 4 ...
Page 70: ...Page 70 V E C T O R O W N E R S M A N U A L NOTES section 6 ...
Page 83: ......
Page 84: ......