82 |
City Series CB40E-12
installation
Glass Panel Installation (Part # 656-916)
919-658b
10.24.16
tooltip
CB40E GLASS PANEL INSTALLATION
1. Turn off unit and allow to cool to room temperature. Remove the outer safety
glass and inner ceramic firebox glass panels and any media installed — see
manual for instructions.
2. Identify panels and order of installation.
tooltip
1
1
4
2/3
5
7
6
tooltip
tooltip
tooltip
tooltip
Small Inner
Base Panels
Lower Brackets
Lower Metal Base Panel
& Lower Glass Panel
Lower Front
Base Panel
Back Side Panels
5. Install lower metal base panel (2) - Repeat step to install lower glass
panel (3) over lower base panel.
7. Reinstall inner ceramic firebox glass panels.
8. Install lower front base panel—as shown below (5).
9. Install back side panels (6,7) — these are held in position with magnets.
10. Install outer safety barrier glass (3 pieces). See manual for instructions.
11. Reverse Step 1 to reassemble unit.
12. Reverse steps to remove panels.
6. Carefully manoeuvre the back glass panel (4) to the back wall of the firebox.
Center the glass panel and position bottom of panel into brackets installed
in previous step. Place the brackets on the top edge of the glass and secure
to the unit with one screw on each side once back glass panel is in position.
4 Slide the supplied brackets behind the small panels and the back wall in
the orientation shown below.
Back Wall of Unit
Lower Bracket
Part #656-218
Small Inner
Base Panel
tooltip
3. Install back inner base panels (1) - seat both small panels in locations
shown below.
Back glass panel
clip (part # 656-202)
orientation
Ceramic
Safety Glass
1
CITY SERIES
Summary of Contents for CB40E-LP12
Page 106: ...106 City Series CB40E 12 warranty ...
Page 107: ......