3 ft. (0,9 m)
Minimum
2 ft. (0,6 m)
Minimum
10 ft. (3,0 m)
Note:
These are a generic set of chimney installation
instructions. Always follow the manufacturers
own instructions explicitly. Verify the Minimum
Recommended Heights for Fireplace Flue (Table 1 in the
Installation section).
Note:
Increasing the chimney height above this minimum
level will sometimes help your unit to “breathe” better
by allowing a greater draft to be created. This greater
draft can decrease problems such as, difficult start-ups,
back-smoking when door is open, and dirty glass. It
might be sufficient to initially try with the minimum
required height, and then if problems do arise add
additional height at a later date.
4. Slide the roof flashing over your chimney and seal the flashing
to the roof with roofing compound. Secure the flashing to your
roof with nails or screws.
5. Place the storm collar over the flashing, sealing the joints with
a silicone caulking.
6. Fasten the raincap with spark screens (if required) to the top
of your chimney.
7. For optimum efficiency when installing into a masonry chimney,
size accordingly, i.e. the 6" (152mm) flue dia. is 28.28 sq.in.
Step-by-step chimney and
connector installation
1. With your location already established, cut and frame the roof
hole. It is recommended that no ceiling support member be cut
for chimney and support box installation. If it is necessary to
cut them, the members must be made structurally sound.
2. Install radiant shield and support from above.
3. Stack the insulated pipe onto your finish support to a minimum
height of 3 feet above the roof penetration, or 2 feet above any
point within 10 feet measured horizontally. There must be at
least 3 feet of chimney above the roof level.
EN
14
installation
Summary of Contents for Contura Ri50
Page 30: ...EN 30 5 6 8 mm wrench or use crescent wrench installation ...
Page 40: ...1 2 3 4 EN 40 Installing the firebox cladding installation ...
Page 41: ...7 5 6 8 EN 41 installation ...
Page 42: ...11 9 10 EN 42 installation ...
Page 50: ...EN 50 maintenance ...
Page 51: ...EN 51 Replace front glass First 2 1 Remove side glass maintenance ...
Page 52: ...EN 52 maintenance ...
Page 53: ...EN 53 Replace gasket door First 3 1 2 Remove side glass Remove front glass maintenance ...
Page 54: ...EN 54 maintenance ...
Page 55: ...EN 55 maintenance ...
Page 56: ...EN 56 maintenance ...
Page 57: ...EN 57 PRESS PRESS maintenance ...
Page 58: ...EN 58 maintenance ...
Page 59: ...EN 59 Remove gasket back 4 maintenance ...
Page 60: ...EN 60 maintenance ...
Page 61: ...EN 61 Remove door 5 maintenance ...
Page 62: ...EN 62 maintenance ...
Page 63: ...EN 63 maintenance ...
Page 65: ...EN 65 maintenance ...
Page 66: ...EN 66 maintenance ...
Page 67: ...391697 Assembled Door Spare part number EN 67 Replacement parts parts list ...
Page 68: ...EN 68 Replacement parts Left or Right parts list ...
Page 77: ...NOTES ...
Page 79: ......
Page 80: ...NOTES ...
Page 81: ...EN 81 notes ...
Page 82: ...EN 82 notes ...
Page 83: ......