EN
11
Combustible wall finishing material clearances
Please read the section below carefully as clearances are measured from rear heat deflector and side of optional trim or finishing
panels.
Combustible wall finishing clearances
Contura
Ri50
from
Optional
Trim
A - Sides
B - Top*
C - Material Thickness
1/4"
6mm
N/A
1-1/2" max.
38mm
from
Finishing
Panels
1/4"
6mm
N/A
1-1/2" max.
38mm
from
Top of Unit
N/A
2"
51mm
1-1/2" max.
38mm
* B - APPLIES TO HORIZONTAL VENTING INSTALLATIONS LOWER THAN THE TOP OF THE
UNIT ONLY. (VENT EXIT REAR OF UNIT)
A
C
B
C
A
installation
Summary of Contents for Contura Ri50
Page 30: ...EN 30 5 6 8 mm wrench or use crescent wrench installation ...
Page 40: ...1 2 3 4 EN 40 Installing the firebox cladding installation ...
Page 41: ...7 5 6 8 EN 41 installation ...
Page 42: ...11 9 10 EN 42 installation ...
Page 50: ...EN 50 maintenance ...
Page 51: ...EN 51 Replace front glass First 2 1 Remove side glass maintenance ...
Page 52: ...EN 52 maintenance ...
Page 53: ...EN 53 Replace gasket door First 3 1 2 Remove side glass Remove front glass maintenance ...
Page 54: ...EN 54 maintenance ...
Page 55: ...EN 55 maintenance ...
Page 56: ...EN 56 maintenance ...
Page 57: ...EN 57 PRESS PRESS maintenance ...
Page 58: ...EN 58 maintenance ...
Page 59: ...EN 59 Remove gasket back 4 maintenance ...
Page 60: ...EN 60 maintenance ...
Page 61: ...EN 61 Remove door 5 maintenance ...
Page 62: ...EN 62 maintenance ...
Page 63: ...EN 63 maintenance ...
Page 65: ...EN 65 maintenance ...
Page 66: ...EN 66 maintenance ...
Page 67: ...391697 Assembled Door Spare part number EN 67 Replacement parts parts list ...
Page 68: ...EN 68 Replacement parts Left or Right parts list ...
Page 77: ...NOTES ...
Page 79: ......
Page 80: ...NOTES ...
Page 81: ...EN 81 notes ...
Page 82: ...EN 82 notes ...
Page 83: ......