24
|
Bellavista® B36XTCE-11 Gas Fireplace
installation
UNIT ASSEMBLY PRIOR TO INSTALLATION
The Top Nailing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the fireplace is
moved into position.
TOP STANDOFF ASSEMBLY
The top standoffs are shipped in a flat position and must be folded into shape and
attached.
Take each standoff and bend into the correct shape. Bend up at the bend lines until
the tab in the standoff and the pre-punched slots on the fireplace top line up. Be sure
to use correct slots, they are marked.
B36XT/
B36XTE/
B36XTCE
STANDOFF SLOT LOCATION
B36XT/
B36XTE/
B36XTCE
TopView
B36X
B36X
Nailing strip for
Tile Finish (set
back 1/2")
Nailing strip for
Clean Finish (set
flush with unit)
1.
There are 8 (eight) side nailing strips and one top nailing strip available on the unit. One set of four (4) are for a clean finish installation, the other set are
for a tile finish installation as they are set back 1/2" (13mm). The top nailing strip is adjustable to 1/2" (13mm).
2.
Bend the required four (4) nailing strips to 90º.
3.
Attach top nailing strip with one (1) screw (located at the back of the nailing strip). Adjust to required position, flush or back 1/2" and tighten screw.
Nailing strip for
Tile Finish (set
back 1/2")
Nailing strip for
Clean Finish (set
flush with unit)
Adjustable Top
Nailing Strip
NAILING STRIPS
Summary of Contents for B36XTCE-11
Page 70: ...70 Bellavista B36XTCE 11 Gas Fireplace parts list 13 12 19 40 38 39 41 MAIN ASSEMBLY ...
Page 76: ...76 Bellavista B36XTCE 11 Gas Fireplace warranty ...
Page 77: ...Bellavista B36XTCE 11 Gas Fireplace 77 notes ...
Page 78: ...78 Bellavista B36XTCE 11 Gas Fireplace notes ...