Manual
– TopCon TC.LAE
Installation and commissioning
37 / 56
2016-06-08
Check the coolant level in the internal expansion reservoir on the
device front side. For the procedure, refer to 6.2.6.5, page 38.
If the coolant do not fill-up the expansion reservoir,
repeat the filling and pumping procedure according the steps
before.
If the coolant fill-up the expansion reservoir,
follow the following steps.
Switch off the device main switch on the device front side.
Switch position:
“0”.
Let the pump switch in position
:”1” (switched on)
Remove the filling hose,
refer to chapter 6.2.6.3, page 35.
Fasten the Allen screws in the filling block.
For the procedure, refer to chapter 6.2.6.2, page 34.