
REED
00 MODEL:
C50SS
TRAILER CONCRETE PUMP
MAINT
PAGE
17
CIRCUIT OPERATIONAL SEQUENCE
In the operational sequence of the
MAIN PUMP CIRCUIT
and with the engine running and
throttle adjusted to maximum, the main pump is idling. When the
PUMP
switch is placed
ON
and volume control open, the hydraulic drive cylinders begin to cycle.
The cylinder to receive the flow from the hydraulic pump, the one being pressurized, is the
one moving forward or the one with the rod fully retracted and ready to extend. In this
example,
CYL “A”
. Cylinder
“A”
extends and at full extension, the sensor of
CYL “B”
is
activated, sending a signal to the black box, which then sends a signal to the
PCP
valve.
This valve causes the position of the swashplate to be changed and
CYL “B”
is being
pressurized and extends. The signal from the sensor, is also used to shift the
S-TUBE
to
CYL “B”
. (This is explained in the Shift Circuit Description). This alternating cycling takes
place continuously until the
PUMP
switch is turned
OFF
.
It can be noted in the schematic and diagram above, that the main pressure and flow is
only directed to one side of the hydraulic drive cylinder. In this instance, it is directed to the
barrel end of the cylinder. To establish the closed loop, the rod side of the cylinders are
connected together. The purpose of this arrangement, is to transfer the hydraulic oil from
one to the other, during the extension/retraction stroke. In example: As
CYL “A”
is being
extended, the oil on the rod side of the cylinder is forced out and is directed to the rod side
of
CYL “B”
, causing the rod to retract. The fluid that is in the barrel end of
CYL “B”
is
forced back to the pump.
REVISION:
Summary of Contents for 00 C50SS
Page 12: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 11 REVISION...
Page 29: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 28 MODEL C50SS REVISION...
Page 36: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 06 REVISION...
Page 37: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 07 LUBE POINT LOCATIONS REVISION...
Page 50: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 20 REVISION...
Page 55: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 25 REVISION...
Page 59: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 29 REVISION...
Page 60: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 30 REVISION S TUBE CIRCUIT HYD DIAGRAM...
Page 63: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 33 REVISION...
Page 66: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 36 REVISION...
Page 67: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 37 REVISION...
Page 72: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 42 REVISION...
Page 76: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 46 REVISION...