Keep a sufficient distance away from slopes, pits, trenches and excavations that
could breakaway.
•
Make every attempt to set up as near as possible to placement site. The shorter the
pumping distance the greater the material delivery.
When the site for the operation has been selected proceed to set up unit for pumping.
•
Disconnect safety chain, electrical cable and hitch from towing vehicle.
DELIVERY SYSTEM SUGGESTIONS
The delivery system is an arrangement of those components used from the pump
discharge to the placement site. This could consist of rubberized material hose, steel
piping, clamps, couplers and reducers. How this delivery system is set up, what
components are used will greatly affect the end result of efficient and productive concrete
pumping. The following suggestions are offered to assist in achieving your objective and
for your consideration in laying out the delivery line.
•
Use the most direct line as is feasible from the concrete pump to the placement area.
•
Set up the delivery line using a minimum of rubber hose. Rubber hose offers three
(3) times the resistance to the flow of concrete as compared to steel pipe.
•
Concrete will also flow with less back-pressure through pipe than through hose.
•
Minimize the use of bends in the hose. This requires more pumping pressure.
•
Place the hoses or pipe to the farthest placement point from the hopper discharge
outlet
FIRST.
It is easier to remove lines than it is to add as the pumping operation
takes place.
•
The steel pipe, elbows, and reducers and hoses should be equipped with heavy-duty
ends. These ends have a higher-pressure capability than the standard ends.
•
Only connect together couplings or clamps that are clean and seals that will retain the
slurry in the delivery line. Dirty couplings
LEAK
and when pressurized the leaking of
water will inevitably cause blockage.
•
DO NOT USE
any worn or damaged hoses, pipes or couplings.
REVISION:
Summary of Contents for 00 C50SS
Page 12: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 11 REVISION...
Page 29: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP OPER PAGE 28 MODEL C50SS REVISION...
Page 36: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 06 REVISION...
Page 37: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 07 LUBE POINT LOCATIONS REVISION...
Page 50: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 20 REVISION...
Page 55: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 25 REVISION...
Page 59: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 29 REVISION...
Page 60: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 30 REVISION S TUBE CIRCUIT HYD DIAGRAM...
Page 63: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 33 REVISION...
Page 66: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 36 REVISION...
Page 67: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 37 REVISION...
Page 72: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 42 REVISION...
Page 76: ...REED 00 MODEL C50SS TRAILER CONCRETE PUMP MAINT PAGE 46 REVISION...