background image

 

 

11

 

- Loosen the two screws (1) on each side of the brush roll.

 

 

- Move the brush roll until it slightly contacts the conveyor belt.

 

 

- Retighten screws (1).

 

 

 

Stretch conveyor belt (in case of slipping) 

 

 

-Loosen counternut (1).

 

 

-Turn nut (2) once clockwise.

 

 -Tighten 

counternut. 

 

 

!

 

Excessive stretching can reduce the life span of the conveyor belt

 

 

 

 

 

                                                                                                                                                                                 

 

 

 

REPAIR AND MAINTENANCE 

 

Installing and removing the conveyor belt

 

 

- Loosen screws on both sides (1) and remove the chassis.

 

Summary of Contents for RINK 1005

Page 1: ...E THE SAFE USE AND TO ACHIEVE THE BEST PERFORMANCE IT IS ESSENTIAL THAT THIS OPERATING MANUAL IS CAREFULLY READ BEFORE THE RINK IS USED 0948 English 933 120 410 Operating and Parts manual RINK Model 1...

Page 2: ...hours 9 Oil change for conveyor belt gears every 2 years 10 Axle maintenance every 100 hours 10 Adjust distance between the brush and belt 11 according to requirements Stretch conveyor belt in case of...

Page 3: ...stood the operating instructions and in particular this chapter Safety Regulations Detach the spreader from the towing vehicle during maintenance and service work Only use original spare parts from th...

Page 4: ...of danger of the spreader since rotating parts and foreign flying particles might cause any injuries 9 Adjusting and repair work on axle wheel bearings tyres must only be undertaken by properly train...

Page 5: ...7 m 74 Width 1 74 m 66 Height 1 00 m 40 1 30 m 51 Loading capacity 0 75 m 0 98 cu yd Weights Authorized total weight 1700 Kg 3740 lbs 1700 kg 3740 lbs Authorized axle load 1300 kg 2860 lbs Authorized...

Page 6: ...rear side Check lighting set After the first ride with a full load Retighten wheel nuts Check wheel hub clearance and have it adjusted if necessary Test tyre pressure OPERATION Before every ride Chec...

Page 7: ...e support PTO speed 450 rpm To ensure optimum operation the oil temperature should have reached a temperature of around 25o C before starting work see viewing window at the oil tank Check the oil leve...

Page 8: ...e distribution 0 to 10 Adjusting spreading thickness The spreading thickness mm is dependent on the speed of the towing vehicle the speed of the conveyor belt regulator Set the required spreading thic...

Page 9: ...ease 1 Bearings on both sides of the brush roll 2 Bearings on both sides of the rear conveyor shaft 3 Bearings on both sides of the front conveyor shaft 4 Bearings on both sides of the drive axle Bear...

Page 10: ...0 6 l Oil SAE 120 to 140 Screw on filler screw with the new gasket Axle maintenance every 100 operating hours Maintenance work on the axle should only be carried out by fully trained and authorised pe...

Page 11: ...belt Retighten screws 1 Stretch conveyor belt in case of slipping Loosen counternut 1 Turn nut 2 once clockwise Tighten counternut Excessive stretching can reduce the life span of the conveyor belt R...

Page 12: ...using the two tension screws until the marked length is stretched to 487 mm 19 17 distance between centres Allow the conveyor belt to run in for approx 30 minutes until it runs centrally The conveyor...

Page 13: ...A and drain off the oil Screw the suction hose back into place Top up with Bio Hydraulic oil CG 46 until the level reaches the centre of the viewing window 3A Screw the filling nozzle back on Please n...

Page 14: ...always specify the following data when ordering Chassis number Ident number Model year of construction if available Part number from respective spare parts list Designation Order number Ordering examp...

Reviews: