The floor / ceiling strength in which the UPS and batteries are placed must take into
account the maximum pressure of the equipment.
4.
The floor on which the devices are located must be stable, level and flat.
5.
The room in which the battery cells will be located due to the possibility of generating
small amounts of hydrogen must be equipped with a ventilation system suitable for the
capacity of installed batteries in accordance with the requirements of EN 50272-2 /
2007.
6.
Unless there is no other place for UPS room, in addition to its UPS and battery mounts,
shall provide for the installation of a power switchboard, a switchboard, an external
bypass switch and a battery disconnector, as well as an air conditioning system.
In order to prolong the life of the device, a suitable installation site should be provided to ensure
that:
1.
Ease of connection to the installation
2.
Sufficient space to handle
3.
Ventilation / air conditioning for proper cooling of the power supply
4.
Protection against gases that may cause corrosion
5.
Protection against excessive moisture and heat sources
6.
Protection against dust and other contaminants
7.
Proper fire protection
8.
The working temperature should be between 20 and 25 ° C. At such temperatures, the
batteries show optimum performance.
Each UPS casing is equipped with castors for maneuvering the UPS at the installation site for
proper setup. After mounting the UPS, lock the UPS by removing the stabilizing screws. The
spacing and dimensions of the UPS base are shown in the figures below:
Figure 2-4 Basic view UPS COVER HS 105, HS 205 and HS 305