red
TECNIKA 28-35
USE AND INSTALLATION MANUAL
Chapter
6
page 33
Start-up procedures
Technical dept. - All rights reserved - Reproduction prohibited
10A
FS1
1
2
L1
Alarm
thermostat
–
95
0
C
Operating
thermostat
C
C
N
Flue
gas
thermostat
C
Flue
gas
fan
Ì1
~1
SB1
STh
BTh
FTh1
START
indicator
5
5
4
N
L
N
PE
220
V
~
1
2
3
1
2
2
1
2
Flue
gas
FTh2
HL1
HL2
C
1
2
Alarm
‐
cleaning
OPTION
SB2
START
7
8
Room
thermostat
N
Overheating
HL3
6.3.1
Wiring diagram
The wiring diagram of the "Tecnika” hot water wood gasification boiler is shown in
Figure 6.2.1
Preliminary
checks
The first start-up must be performed by professionally qualified personnel.
RED will not be held liable for any damage to persons, animals or property
caused by failure to observe the above instructions.
Ambient thermostat
Combustion
gas
thermostat
Operation
thermostat
Combustion
gas