HandPunch 50E Manual
Page 9
Planning an Installation
Site
Preparation
Before you begin installation, check the site blueprints, riser diagrams,
and specifications for important information about HandPunch location
and for other systems that connect to the HandPunch. Look for any
existing wall preparations and wiring that other contractors may have
installed for the HandPunch. A wire routing layout diagram (see Figure
3-2 on page 15) is provided to assist in planning wire routing.
HandPunch
Placement
The recommended height for the HandPunch platen is 40 inches
1
(102
cm) from the finished floor. The HandPunch should be out of the path of
pedestrian and vehicular traffic. Avoid placing the HandPunch where
users must cross the swing path of a door. The HandPunch should be
in an area where it is not exposed to excessive airborne dust, direct
sunlight, water, and/or chemicals.
Figure 2-1: HandPunch Placement Rules
For the following sections, Recognition Systems does not supply
hardware items such as power or communications wiring.
1. This height conforms to ADA standards.
40 in. (102 cm.)
NOTE
Summary of Contents for HandPunch 50E
Page 1: ...HandPunch 50E Manual ...
Page 10: ...Introduction Page 8 This page is intentionally blank ...
Page 14: ...Planning an Installation Page 12 This page is intentionally blank ...
Page 22: ...Wiring Connections Page 20 This page is intentionally blank ...
Page 24: ...Ereasing Memory Page 22 This page is intentionally blank ...
Page 26: ...Closing the HandPunch Page 24 This page is intentionally blank ...
Page 30: ...Enter a Command Menu Page 28 This page is intentionally blank ...
Page 50: ...Maintenance Page 48 This page is intentionally blank ...
Page 56: ...Appendix B Troubleshooting Guide Page 54 This page is intentionally blank ...
Page 58: ...Warranty Page 56 This page is intentionally left blank ...