4.1 HX2 Series Maintenance Schedule
Even under the best of conditions, some regular maintenance on the HX2 is needed. The
table below is a general guide as to how often this should be done.
T
ABLE
4-1 R
ECOMMENDED
I
NSPECTION
I
NTERVALS
Item
At Start
Up
Weekly
Monthly
Quarterly Annually
Bi-
annually
Circulator Pump
⚫
⚫
Control Panel
⚫
⚫
Control Valve
⚫
⚫
Drain Valve
⚫
⚫
Pressure Gauge
⚫
⚫
Heat Exchanger Gaskets
⚫
⚫
Heat Exchanger Tube Bundle
⚫
⚫
Manual Shut Off Valves
⚫
⚫
Piping Connections
⚫
⚫
Pressure / Temperature Relief Valve
⚫
⚫
Solenoid Valve
⚫
⚫
Steam Trap
⚫
⚫
Support Stand
⚫
Strainer
⚫
⚫
Vacuum Breaker
⚫
⚫
4.2 Troubleshooting
The table below is a quick summary of common problems encountered, and their most
likely causes, along with a recommendation for how to correct them. These are by not
intended to be an all-inclusive, definitive answer to every field issue that can occur, but
rather a reasonable approach to common problems considering the highest likelihood of
root cause, and how we would suggest addressing those problems based on our own
experience.
Summary of Contents for HX2 Series
Page 1: ...Installation Operation and Maintenance Manual INSTALLATION OPERATION AND MAINTENANCE MANUAL ...
Page 14: ...SECTION 2 INSTALLATION HX2 SERIES 2 6 THIS PAGE LEFT INTENTIONALLY BLANK ...
Page 17: ...IOM SECTION 3 OPERATION HX2 SERIES 3 3 3 3 System Wiring Diagram Sizes 0630 and 0636 ...
Page 18: ...IOM SECTION 3 OPERATION HX2 SERIES 3 4 3 4 System Wiring Diagram Sizes 0830 Through 1236 ...
Page 39: ...IOM APPENDIX 1 THE CONTROL PANEL HX2 SERIES A 13 THIS PAGE LEFT INTENTIONALLY BLANK ...