background image

Rail positioning

REC Peak Energy 72 Installation Manual - UL 1703
Rev C.3 - 02.16 

Ref: NE-06-06-C

6

MouNtINg tHe PANeLs

ReC Peak energy 72 panels are designed for capturing solar radiation and are not suitable for installation as overhead or vertical glazing.  

the panels are considered to be in compliance with uL 1703, only when the panel is mounted specified by the mounting instructions below.  

the junction box on the back of the panel is protected to IP67 and hence panels can be mounted in any orientation.

Remove any labels or stickers that may be on the front of the panels (where applicable) and ensure no residue is left on the glass.

panEl InstallatIon

ReC Peak energy 72 panels are typically installed on a rail-based mounting system.  there are two different methods of installing an ReC Peak 

energy 72 panel, as decribed below (fig 1a & 1b), depending on the design of the array.  the rails can run under the frame or parallel to the frame, 

directly under the indicated clamping zones.  ensure the mounting structure is able to withstand anticipated wind and snow loads.  Mounting 

hardware is not supplied by ReC.  follow the mounting hardware manufacturer’s instructions and recommendations at all times.

walls for mechanical 

connectors

walls exposed to 

buckling load

fig. 2:  Rail specification 

H channel rail

i)  Rail specifications

Clamps should be fastened to C or H channel rails suitable for the system design and expected design loads (fig. 2).

• 

thickness of walls for mechanical connections: min. 5/32 in (4.0 mm)

• 

thickness of walls exposed to buckling load: min. 7/8 in (2.0 mm)

• 

Moment of Inertia for profile area about x-x: min array mounting diagram 13/34 in

4

 (192 mm

4

)

fig. 1:  Panel mounting options

The overlap between support rail and the outer edge of the panel frame must be a minimum of 7/32 in (6 mm).

(a) Long side mounting

Ensuring sufficient airflow and adequate cooling of the panels can help improve performance.  There must be a minimum distance 

of 4 in (100 mm) between the uppermost part of the roof and the lowest part of the panel to dissipate heat produced.

(b) Mounting holes

The panels must be installed so that the cells are not shaded as this will drastically reduce electrical output.  If partial shading is 

inevitable at certain times of the day or year, it must be kept to an absolute minimum.

grip length
min 1 

3/4

 in

grip length
min 1 

3/4

 in

grip depth min 1/8 in

grip depth min 1/8 in

fig. 3:  Clamp specifications

walls exposed to 

load min 5/32 in

ii)  Clamp specifications

ReC Peak energy 72 panels have been evaluated by uL for mounting using rails in combination with end and mid clamps, AstM f593C 

stainless steel screw and rail nuts with the below ratings and dimensions.  Alternatively clamps meeting the specifications shown in the table 

below can be used to secure the panel to the mounting structure (fig. 3):

Criteria

Specification

Material specification

Min. yield strength

2089 ton/ft² (200 Mpa)

Min. tensile strength

2610 ton/ft² (250 Mpa)

e.g. 6005 t5 alloy

Min. grip length

3/4

 in (44.45 mm)

Min. grip depth

1/8 in (5 mm)

Min. thickness of load 

carrying walls

5/32 in (4 mm)

screw connection

5/16 in (8 mm) bolt & nut

5/16 in (8mm) washer 

AstM f593C (stainless steel)

Each panel must be securely fixed to the mounting structure at a minimum of four points (fig. 5).

 

Summary of Contents for Peak Energy 72

Page 1: ...Installation manual rec Peak energy 72 FortheinstallationofallRECPeakEnergy72 solarpanels certifiedaccordingtoUL1703...

Page 2: ...Safetyintheworking area 4 ii Preventing currentgeneration 4 iii Specific hazards of DC electricity 4 iv Safetyrequirements 4 MECHANICAL INSTALLATION 5 FIRE GUIDELINES 5 ORIENTATION 5 ENVIRONMENTAL FA...

Page 3: ...ty or personal safety Indicates important notes on best practice to help with the installation or to avoid potential damage to the panels array or property For further information on installation proc...

Page 4: ...st be followed to address these increased outputs In installations not under the requirements of the NEC the values of ISC andVOC marked on the panels must be multiplied by a factor of 1 25 when deter...

Page 5: ...ocal authorities for applicable regulations concerning setbacks or other restrictions that may apply for ground mounted solar arrays The use of DC ground fault interrupters is recommended Check whethe...

Page 6: ...kling load min 7 8 in 2 0 mm Moment of Inertia for profile area about X X min array mounting diagram 13 34 in4 192 mm4 Fig 1 Panel mounting options The overlap between support rail and the outer edge...

Page 7: ...ails fig 1 of aluminium or galvanized steel to avoid galvanic corrosion suitable for the application and appropriate for the local environment These must be held in position by bolts and flange nuts a...

Page 8: ...ut 10 ensuring a conductive connection fig 9 Tighten according to manufacturer s instructions Fig 9 Recommended grounding Cross section AWG Type Torque in lbs 4 6 Stranded 35 8 Stranded 25 10 14 Stran...

Page 9: ...ing points to ground are tight secure and free from corrosion which could break the continuity between the panels and ground Recycling REC has made every effort to ensure panel packaging is kept to a...

Page 10: ...rated 4 mm solar cable 47 47 4 mm connectors MC4 connectable ELECTRICAL DATA STC REC285PE REC290PE REC295PE rec300pe REC305PE REC310PE REC315PE REC320PE REC325PE NominalPower PMPP Wp 285 290 295 300...

Page 11: ...ction 48 12 2014 B 3 Revision of low light behavior in Electrical Data 02 2014 B 4 Updates to cable length 47 Type 2 System Fire Class rating addition of Connections chapter 03 2015 C Updates required...

Page 12: ...RECSolarPte Ltd 20TuasSouthAvenue14 Singapore637312 Singapore Tel 6564959228 Mail post recgroup com www recgroup com...

Reviews: