panEl HanDlInG

All ReC Peak energy 72 panels should be handled with care.  All warnings and instructions on the packaging should be observed.  follow 

these guidelines when unpacking, transporting or storing the panels:

• 

Record the serial numbers prior to installation and note the information in the system documentation. 

• 

Carry the panels using both hands and avoid using the junction box as a grip.

• 

Do not allow the panels to sag or bow under their own weight when being carried. 

• 

Do not subject the panels to loads or stresses.  Do not stand on them or drop them. 

• 

keep all electrical contacts clean and dry.

• 

store panels in a  dry and properly ventilated room.

• 

Do not apply force to the backsheet.

• 

Avoid using sharp or pointed objects if panels require marking.

• 

Never apply paints, adhesives or detergents to the back of the laminate.

• 

Do not use any solar panel that is damaged or been tampered with.

• 

Never attempt to disassemble the panels.

If the panel front glass is broken or laminate back sheet is damaged, it can expose personnel to hazardous voltages. 

MeCHANICAL INstALLAtIoN 

fIRE GuIDElInEs 

ReC Peak energy 72 panels have a type 2, Class C fire rating.  the fire rating of this panel is only valid when mounted in the manner specified in 

these mechanical mounting instructions.  utilize the following fire safety guidelines when installing ReC Peak energy 72 panels: 

• 

Check with local authorities for fire safety guidelines and requirements relevant to where the panels will be installed.

• 

the system design should ensure that it can be easily accessed in the event of a fire.

• 

Check with local authorities for applicable regulations concerning setbacks or other restrictions that may apply for ground-mounted 

solar arrays.

• 

the use of DC ground fault interrupters is recommended.  Check whether this is also required by local and national codes.

• 

All electrical appliances are a fire risk.  the panel must therefore be installed with a suitable distance of 4 in (10 cm) between the panel 

and the closest  surface.  this allows the free circulation of air beneath the panels.

oRIEntatIon

to maximize system output, panels should be installed at the optimum orientation and tilt angle.  the specifics of this depend on location and 

can be calculated by a qualified system designer.  A lower angle of panel installation increases the requirement for regular cleaning. 
the optimal mounting position of panels results in the sun’s rays falling perpendicular (i.e. at 90°) to the surface.  All panels in a string should, 

wherever possible, have the same orientation and tilt to ensure the system does not underperform due to mismatched outputs.

The panels should not be exposed to artificially concentrated sunlight.

EnVIRonmEntal faCtoRs

ReC Peak energy 72 panels are designed to provide decades of durable and stable output.  operating temperatures should be between 

-40°f and 185°f (-40°C and +85°C). 
the panels are not suitable for installation in potentially hazardous locations nor should they be installed in the following locations: 

• 

Near sources of flammable gases or vapors e.g. gas containers or spray paint facilities.

• 

Near open flames.

• 

under water or in water features.

• 

where exposed to sulfur e.g. near sulfur springs or volcanoes.

• 

where the panels may be exposed to harmful chemicals.

Ensure panels are not exposed to direct contact with salt water/spray and avoid installation in areas subject to high salt mist 

content.

Summary of Contents for Peak Energy 72

Page 1: ...Installation manual rec Peak energy 72 FortheinstallationofallRECPeakEnergy72 solarpanels certifiedaccordingtoUL1703...

Page 2: ...Safetyintheworking area 4 ii Preventing currentgeneration 4 iii Specific hazards of DC electricity 4 iv Safetyrequirements 4 MECHANICAL INSTALLATION 5 FIRE GUIDELINES 5 ORIENTATION 5 ENVIRONMENTAL FA...

Page 3: ...ty or personal safety Indicates important notes on best practice to help with the installation or to avoid potential damage to the panels array or property For further information on installation proc...

Page 4: ...st be followed to address these increased outputs In installations not under the requirements of the NEC the values of ISC andVOC marked on the panels must be multiplied by a factor of 1 25 when deter...

Page 5: ...ocal authorities for applicable regulations concerning setbacks or other restrictions that may apply for ground mounted solar arrays The use of DC ground fault interrupters is recommended Check whethe...

Page 6: ...kling load min 7 8 in 2 0 mm Moment of Inertia for profile area about X X min array mounting diagram 13 34 in4 192 mm4 Fig 1 Panel mounting options The overlap between support rail and the outer edge...

Page 7: ...ails fig 1 of aluminium or galvanized steel to avoid galvanic corrosion suitable for the application and appropriate for the local environment These must be held in position by bolts and flange nuts a...

Page 8: ...ut 10 ensuring a conductive connection fig 9 Tighten according to manufacturer s instructions Fig 9 Recommended grounding Cross section AWG Type Torque in lbs 4 6 Stranded 35 8 Stranded 25 10 14 Stran...

Page 9: ...ing points to ground are tight secure and free from corrosion which could break the continuity between the panels and ground Recycling REC has made every effort to ensure panel packaging is kept to a...

Page 10: ...rated 4 mm solar cable 47 47 4 mm connectors MC4 connectable ELECTRICAL DATA STC REC285PE REC290PE REC295PE rec300pe REC305PE REC310PE REC315PE REC320PE REC325PE NominalPower PMPP Wp 285 290 295 300...

Page 11: ...ction 48 12 2014 B 3 Revision of low light behavior in Electrical Data 02 2014 B 4 Updates to cable length 47 Type 2 System Fire Class rating addition of Connections chapter 03 2015 C Updates required...

Page 12: ...RECSolarPte Ltd 20TuasSouthAvenue14 Singapore637312 Singapore Tel 6564959228 Mail post recgroup com www recgroup com...

Reviews: