DoCuMeNt HIstoRY

Date

Revision number

Reason

10.2012

A

first release

06.2014

B

updates to electrical data, panel dimensions, deletion of snap n Rack specific specifications

10.2014

B.2

textual updates according to uL 1703, section 48

12.2014

B.3

Revision of low light behavior in electrical Data

02.2014

B.4

updates to cable length (47” ), type 2 system fire Class rating, addition of Connections chapter

03.2015

C

updates required by addition of 1500 v ReC Peak energy 72 xv series

11.2015

C.2

updates to technical Information, general Data and Low light behaviour value

02.2016

C.3

updates to technical Data @ stC and updates to permitted clamping distance

Summary of Contents for Peak Energy 72

Page 1: ...Installation manual rec Peak energy 72 FortheinstallationofallRECPeakEnergy72 solarpanels certifiedaccordingtoUL1703...

Page 2: ...Safetyintheworking area 4 ii Preventing currentgeneration 4 iii Specific hazards of DC electricity 4 iv Safetyrequirements 4 MECHANICAL INSTALLATION 5 FIRE GUIDELINES 5 ORIENTATION 5 ENVIRONMENTAL FA...

Page 3: ...ty or personal safety Indicates important notes on best practice to help with the installation or to avoid potential damage to the panels array or property For further information on installation proc...

Page 4: ...st be followed to address these increased outputs In installations not under the requirements of the NEC the values of ISC andVOC marked on the panels must be multiplied by a factor of 1 25 when deter...

Page 5: ...ocal authorities for applicable regulations concerning setbacks or other restrictions that may apply for ground mounted solar arrays The use of DC ground fault interrupters is recommended Check whethe...

Page 6: ...kling load min 7 8 in 2 0 mm Moment of Inertia for profile area about X X min array mounting diagram 13 34 in4 192 mm4 Fig 1 Panel mounting options The overlap between support rail and the outer edge...

Page 7: ...ails fig 1 of aluminium or galvanized steel to avoid galvanic corrosion suitable for the application and appropriate for the local environment These must be held in position by bolts and flange nuts a...

Page 8: ...ut 10 ensuring a conductive connection fig 9 Tighten according to manufacturer s instructions Fig 9 Recommended grounding Cross section AWG Type Torque in lbs 4 6 Stranded 35 8 Stranded 25 10 14 Stran...

Page 9: ...ing points to ground are tight secure and free from corrosion which could break the continuity between the panels and ground Recycling REC has made every effort to ensure panel packaging is kept to a...

Page 10: ...rated 4 mm solar cable 47 47 4 mm connectors MC4 connectable ELECTRICAL DATA STC REC285PE REC290PE REC295PE rec300pe REC305PE REC310PE REC315PE REC320PE REC325PE NominalPower PMPP Wp 285 290 295 300...

Page 11: ...ction 48 12 2014 B 3 Revision of low light behavior in Electrical Data 02 2014 B 4 Updates to cable length 47 Type 2 System Fire Class rating addition of Connections chapter 03 2015 C Updates required...

Page 12: ...RECSolarPte Ltd 20TuasSouthAvenue14 Singapore637312 Singapore Tel 6564959228 Mail post recgroup com www recgroup com...

Reviews: