16
Cut flue to length to suit connection.
Ensure ends are burr free and round, test fit flue will
fit over connection.
Apply an 8mm thick silicon bead fully around heater
connection approx. 10mm from the top.
Apply an 8mm silicon bead fully around the inside of
the flue end (heater connection end)
Fit flue clamp over flue (loosely).
Slide flue onto connection spigot fully.
Tighten clamp fully.
Wipe excess silicon, visually check connection to
ensure connection is fully sealed.
INSTALLATION INSTRUCTIONS
(continued)
Summary of Contents for VEKTOR 1100
Page 6: ...6 DIMENSIONS FLUE CONNECTIONS...
Page 10: ...10 FLUE TERMINATION...
Page 28: ...28 Campfire media clear pebbles and small ceramic coals MEDIA INSTALLATION...
Page 46: ...46 WIRING DIAGRAM...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...