22
INSTALLATION INSTRUCTIONS
(continued)
Repeat for connection to underside of fan module.
Repeat for Air intake flue connection.
5.
Fan module outlet connection
Cut tube to length where required.
Ensure ends are burr free and round, test fit flue will
slide over connection.
Apply an 8mm thick silicon bead fully around heater
connection approx. 10mm from the top.
Apply an 8mm silicon bead fully around the inside of
the flue end (heater connection end)
Fit flue clamp over flue (loosely).
Summary of Contents for VEKTOR 1100
Page 6: ...6 DIMENSIONS FLUE CONNECTIONS...
Page 10: ...10 FLUE TERMINATION...
Page 28: ...28 Campfire media clear pebbles and small ceramic coals MEDIA INSTALLATION...
Page 46: ...46 WIRING DIAGRAM...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...